My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP10860
CWCB
>
Water Supply Protection
>
Backfile
>
10001-10999
>
WSP10860
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 3:15:00 PM
Creation date
10/12/2006 4:34:31 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8274.400
Description
Colorado River Basin Salinity Control - General Basinwide Salinity Issues - NPDES
Basin
Colorado Mainstem
Water Division
5
Date
4/1/1992
Title
Colorado River Salinity Standards Compliance at The La Plata Mine - NPDES Permit NM0029505 - New Mexico
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I-" <br />C:J <br />CD <br />0') <br /> <br />In order to determine costs per ton of salt removed through the <br />treatment process, system costs are estimated. construction cost <br />of a surge storage reservoir is estimated at $121,000, based on <br />an excavation of 96,800 cubic yards at $1,25 per yard to provide <br />for 60 acre feet capacity, <br /> <br />Costs of a gravity filtration pretreatment system and reverse <br />osmosis tr~atment system are based on Estimating Water Treatment <br />Costs, VolUme 3, Cost Curves Applicable to 25000 to 1 mgd <br />Treatment Plants, August 1979, Municipal Environmental Research <br />Lab, U.S. Environmental Protection Agency, Cincinnati, Ohio, EPA- <br />600/2-79-1626. Costs are updated from an October 1978 cost base <br />to January 1991 dollars utilizing the Engineering News Record <br />Construction Cost Index (CCI) of 444.7 divided by the October <br />1977 CCI of 265,4 Construction Cost. <br /> <br /> <br />Construction cost of a gravity filtration system is estimated as <br />follows: <br /> <br />Installation of qravitv filtration system based on the maximum <br />process flqw <br /> <br />Construotion Cost <br />site work, interface piping @ 5% <br /> <br />Construction Cost <br /> <br />$ 151,320 <br /> 7,566 ";{ <br /> , <br />$ 158,886 <br /> <br />General contractor overhead and profit <br />@ 10% <br /> <br />15,889 <br /> <br />Subtotal <br /> <br />$ <br /> <br />174,775 <br /> <br />Engineering @ 10% <br /> <br />17,477 <br /> <br />'I <br />,~ <br /> <br />Subtotal <br /> <br />$ <br /> <br />192,252 <br /> <br />-~ <br />'-~ <br />~ <br />] <br />! <br />, <br />I <br />I <br />)j <br />:4 <br /> <br />11 <br /> <br />, <br />i~ <br /> <br />__-__.n-'.':~ J<;,(.. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.