Laserfiche WebLink
<br /> <br /> BLUE RIVER PROJECT OPERA TlONS '. <br /> WATER YEAR 1999 <- Q <br /> DIVERSIONS FOR WATER YEAR C> <br /> TABLE 1 C"t, <br /> (ACRE FEET) o. <br /> "... <br /> c.a <br /> (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) <br /> UPPER NI::l SPRUCI:: <br /> HOOSIER DIVERSIONS BLUE BLUE STORAGE BLUE MCCULLOUGH HOOSIER <br />MONTH TOTAL 1/3 2J3 RIVER CHANGE RIVER CRYSTAL TUNNEL 1929 1948 <br />OCTOBER 0 0 0 304 (404) (100) 0 304 0 (100) <br />NOVEMBER 0 0 0 0 0 0 0 0 0 0 <br />DECEMBER 0 0 0 0 0 0 0 0 0 0 <br />JANUARY 0 0 0 0 0 0 0 0 0 0 <br />FEBRUARY 0 0 0 0 0 0 0 0 0 0 <br />MARCH 0 0 0 0 0 0 0 0 0 0 <br />APRIL 3 1 2 0 0 0 0 3 2 1 <br />MAY 200 66 134 278 121 399 499 958 134 945 <br />JUNE 1,476 491 985 488 1,852 2,340 1.670 3,629 985 4,496 <br />JULY 619 206 413 1.001 146 1,147 127 1,734 413 1,467 <br />AUGUST 217 72 145 670 0 670 839 1,751 145 1,606 <br />SEPTEMBER 80 26 54 1,334 (925) 409 366 1,736 54 757 <br />TOTALS 2,595 862 1,733 4,075 790 4,865 3,501 10,115 1,733 9,172 <br /> <br />Columns 9 and 10 will not equal column 8 due to Upper Blue storage changes. <br />1948 diversions are recorded when water is stored in the Upper Blue and not when water <br />is transferred through the tunnel. <br />