My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP10834
CWCB
>
Water Supply Protection
>
Backfile
>
10001-10999
>
WSP10834
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 3:14:54 PM
Creation date
10/12/2006 4:34:09 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8272.100.60
Description
Colorado River Basin Salinity Control Forum
Basin
Colorado Mainstem
Water Division
5
Date
12/1/1986
Author
CRBSCF
Title
1986 Annual Progress Report - Water Quality Standards for Salinity - Colorado River System - December 1986
Water Supply Pro - Doc Type
Annual Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />under P.L. 93-320 for the McElmo Creek Unit were concluded. <br /> <br />1\j <br />CJ1 <br />w <br />---l <br /> <br />Advance planning and construction of the salinity control <br />features are being incorporated under the Dolores Project. <br />The SCS report on McElmo Creek Unit, published in 1983, shows <br /> <br />the activities of both Reclamation and SCS have been <br /> <br />coordinated and are compatible. <br /> <br />The Uncompahgre Project portion (Stage I) of the <br /> <br />Lower Gunnison Basin Reclamation plan was authorized for <br /> <br />construction by P.L. 98-569. <br /> <br />Advance planning studies <br /> <br />continued, and SCS plans to revise its implementation plan to <br /> <br />include priority areas and implementation phases. <br /> <br />In the Uinta Basin, coordination between Reclamation and <br /> <br />the SCS has been maintained. USDA continues to focus upon <br /> <br />onfarm improvements but has strengthened coordination in the <br /> <br />planning of its canal and lateral group projects as part of <br />the Central Utah proj ect and Reclamation's salini ty proj ect. <br />The preferred Reclamation plan, completed in FY 1985, <br />consists of lining 55 miles of canals and laterals. An <br /> <br />integrated planning report/draft environmental statement has <br />been prepared and was released to the public on August 25, <br />1986. Reclamation is also involved with improvements on <br />approximately 36 additional miles of canals and laterals as <br />part of the Central utah Project. In both cases, the off- <br />farm lateral improvements are compatible with the onfarm <br />program and are planned in co~junction with USDA activities. <br />USDA implementation emphasizes the use of salinity <br /> <br />control/water management plans in conjunction with ACP cost- <br /> <br />-10- <br />
The URL can be used to link to this page
Your browser does not support the video tag.