My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP10818
CWCB
>
Water Supply Protection
>
Backfile
>
10001-10999
>
WSP10818
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2009 11:12:01 PM
Creation date
10/12/2006 4:33:57 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8407.500
Description
Platte River Basin-River Basin General Publications-Missouri River General Publications
Date
10/25/1974
Author
MRBC
Title
1975 Water Assessment-Missouri River Basin-Memorandum of Agreement Between the Missouri River Basin Commission and the US Water Resources Council 3
Water Supply Pro - Doc Type
Operating Principles/Plan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Activity - <br />Subact1vitv <br /> <br />Subactivity Eleven <br /> <br />Regroup and <br />Screen <br />Problems <br /> <br />Parti ci pants <br /> <br />r.1RBC Staff <br /> <br />!1RBC Staff <br /> <br />Group A <br /> <br />Overview <br />Committee <br /> <br />,Des ignated Responsi bil i ty <br /> <br />Develop a problem list, using results of subactivity two, which <br />is consistent with the Regional Preference Future. <br />. <br /> <br />Develop a final problem list, usin9 results of subactivity <br />eleven and display the results (incl~din9 (1) problems; <br />(2) problem areas and analytical areas; and (3) time frame <br />(1975-1985 and 1985-2000) the proble~ becomes severe if not <br />resolved) using a regional map, and Figures ~ and 5; and <br />prepare a technical memorandum describing activity two results. <br /> <br />Review and comment on subactivity twelve information and results, <br /> <br />Review and approve the technical memorandum documenting the <br />results of activity two to be transmitted to \'IRC by the Study <br />Director. <br /> <br />, <br />'" <br />W <br />I <br /> <br />.' <br />..... <br /> <br />Subactivity Twelve -- Develop Final <br />Problem and <br />Issues List <br /> <br />Activity Three <br /> <br />Development of Inform- <br />ation Describing <br />Selected Problems <br /> <br />Subactivity Thirteen -- Develop <br />Effects <br />Information <br />for Each <br />Problem <br /> <br />MRBC Staff and <br />Group /1 <br /> <br />Group A <br /> <br />Subactivity Fourteen -- Define MRBC Staff <br />Potential Level <br />B, Special, <br />Level C and <br />Implementation <br />Study Areas <br /> <br />group A <br /> <br />Evolve the effects information for both the nodified Central <br />Case and the Regional Preference Future using Figure 6 to <br />display by year (1975, 1935 and 2000). <br /> <br />Review and supplement the staff results of subactivity thirteen. <br /> <br />Define tentatively study and analytical areas for Level B, <br />Special, Level C and Implementation study areas for resolving <br />the problem within the region. <br /> <br />Review and supplement the staff results of subactivity fourteen. <br /> <br />'t~t <br />.. <br />
The URL can be used to link to this page
Your browser does not support the video tag.