My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP10818
CWCB
>
Water Supply Protection
>
Backfile
>
10001-10999
>
WSP10818
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2009 11:12:01 PM
Creation date
10/12/2006 4:33:57 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8407.500
Description
Platte River Basin-River Basin General Publications-Missouri River General Publications
Date
10/25/1974
Author
MRBC
Title
1975 Water Assessment-Missouri River Basin-Memorandum of Agreement Between the Missouri River Basin Commission and the US Water Resources Council 3
Water Supply Pro - Doc Type
Operating Principles/Plan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />The elements of this subactivity will be initially evolved by the staff <br />in cooperation with the Group A participants. Once evolved the Group A parti- <br />cipants will review and supplement the data and information to be submitted to <br /> <br />the Overview Committee for endorsement. <br /> <br />Subactivity Nineteen - Establish Priorities <br />Priorities will be established for Level B studies, Special Studies, Level <br />C studies, and Implementation Studies, for each time frame (1975-1985 and 1985- <br />2000). The Group A participants will present a set of priorities for each type <br />of study to the staff. The results of these inputs will be compiled and docu- <br />mented by the staff and submitted to the Overview Committee for endorsement. The <br /> <br />overview committee will then submit their recommended priority listing to the <br />Missouri River Basin Commission of endorsement. <br /> <br />Subactivity Twenty - Prepare the State Regional Report <br /> <br /> <br />During this subactivity the staff with guidance from the Group A participants, <br /> <br />will prepare a draft of the state/regional report. The overview committee will <br /> <br /> <br />review and provide comments on the State/Regional Report prior to conducting <br /> <br />a regionwide review by the Group B participants. <br /> <br />... <br />An outline of the Specific Problem Analysis Report (the State/Regional r- <br />("f') <br />Report) follows: ...-4 <br /> <br />SPECIFIC PROBLEM ANALYSIS REPORT OUTLINE <br /> <br />I. Introduction <br /> <br />The introduction will include a brief statement of the Regional Sponsor's <br />role in the 1975 Water Assessment and any other appropriate introductory infor- <br /> <br />mation. <br /> <br />II. Conclusions and Recommendations (products of Activity 4) <br /> <br />The detailed conclusions and recommendations relevant to the following <br /> <br />items will be presented: <br />o Needs for planning--Identify and recommend the time frame (1975-1985 <br />and 1985-2000), the geographic area covered and type of study (Level B, <br />Level C, <br /> <br />-13- <br /> <br />..----! "'..--..,- - --..- <br />
The URL can be used to link to this page
Your browser does not support the video tag.