My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP10818
CWCB
>
Water Supply Protection
>
Backfile
>
10001-10999
>
WSP10818
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2009 11:12:01 PM
Creation date
10/12/2006 4:33:57 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8407.500
Description
Platte River Basin-River Basin General Publications-Missouri River General Publications
Date
10/25/1974
Author
MRBC
Title
1975 Water Assessment-Missouri River Basin-Memorandum of Agreement Between the Missouri River Basin Commission and the US Water Resources Council 3
Water Supply Pro - Doc Type
Operating Principles/Plan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Schedu1 e A <br />Memorandum of Agreement (MOA) <br />between the <br />Missouri River Basin Commission <br />and the <br />U.S. Water Resources Council <br />1975 Assessment of Water and Related Land Resources <br /> <br />I. Scope of Agreement <br />This document describes the roles and responsibilities of the <br />Missouri River Basin Commission, the detailed procedures, that will be <br />used to conduct Phases II and III of the Specific Problem Analysis <br />protion of the 1975 Assessment and the products that will result <br />therefrom. Specifically, attention is directed, at describing who, <br />when, where, and how the Missouri River Basin Commission in cooperation <br />with the U.S. Water Resources Council (WRC) will conduct the activities <br />referred to in the Missouri River Region. <br />Finally, this document includes an outline of the Specific Problem <br />Analysis Report which is to be prepared by the Missouri River Basin <br />Commission, an organizational structure for carrying out the 1975 Assess- <br />ment activities, a summary of the work schedules and financial plans, <br />and a proposed procedure for reporting progress to the WRC. <br />II. Pub1 i c Participati on <br />The public participation in the specific problem analysis portion <br />of the 1975 Assessment will be accomp1isheJ utilizing Group B participants <br />as described in Section III of this agreement. The states are responsible <br />for public involvement. Each state member of the MRBC represents his <br />state and the public therein. It is up to him to insure appropriate cooperative <br /> <br />\ <br /> <br />1383 <br />
The URL can be used to link to this page
Your browser does not support the video tag.