My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP10784
CWCB
>
Water Supply Protection
>
Backfile
>
10001-10999
>
WSP10784
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 3:14:41 PM
Creation date
10/12/2006 4:31:57 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.200.05.R
Description
Hoover Dam/Lake Mead/Boulder Canyon Project
Basin
Colorado Mainstem
Date
7/1/1939
Title
Statement Concerning Negotiations Regarding Boulder Dam Energy Rates
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />C"":i <br />r- <br />e-,J <br />N <br />c: <br /> <br />.11. <br /> <br />4) that in /lOIllputing the value of felUng wf,ter for <br />the generl'ltion of secondary energy in any t'ut\U"8 <br />IJdjustm6llt a of rat es the fonnula used el1all be <br /> <br />Current price of falling water for firm energy <br /> <br />A <br /> <br />Fixed e.nil operating costa of gener~t1on 'inn tI'uns~ <br />mission of such rinn energy -1L <br /> <br />Cost of finn energy delivered htB <br /> <br />from whi ell ahall be subt rect ed <br /> <br />Fixed nnd operating cost e of generation and trans- <br />mission directly cpplicnble to secondR~7 energy C <br /> <br />Cost of providing, malnte1ning Mil Intenn1ttently <br />opernting standby plenta mlell Bll to make this onergy <br />aR reliable end continuouely 8Vail,ble es firm <br />energy ~ <br /> <br />Total costs (except fallinr; water) for putting <br />second,,!,,! energy on a f1nn energy basis ColD <br /> <br />Value of MUng weter for secondIJry energy A+B-( ~D) <br /> <br />To the first three provisions of this egreement there can be <br /> <br />little objection. but it se<.ma probable th~t the #Ourth "rov1sion <br /> <br />will prove very oompliceted in operation end that it may provs <br /> <br />impossible to arrive at some elements of cost that must be dltl'ived <br /> <br />in order to apply the method. <br />The agreement rlth the Metropol1ttm ?iater D1etrict ,.as <br /> <br />executef by the Seoretary in tl:e form and vd.th the provisions elrefldy <br /> <br />outlined Se those eubm11rtedin the t;pr!ng 01' 1938. es presented at the <br /> <br />meeting in Denver. June 10 end 11. 1938. <br /> <br />At l! conference held in Hhoenix. Arizona, Deeanber 14 to l1:l, <br /> <br />1933. it developed that there would be no agreEl1lent on besse for estimating <br /> <br />competitive rates for Boulder eltergy. Cor:.s1deration Wt'll\ then r.;iven to the <br /> <br />proposal to red'lce the ntes by "npropric:te 1a"\islction ('nd after ner:otiation. <br /> <br />it 'liAa I'lrl',nged thet 1eo;::lalation .,'ould be proposed by the States \"11ich ,."Quld <br />
The URL can be used to link to this page
Your browser does not support the video tag.