Laserfiche WebLink
<br />N <br />r- <br />~,' <br />C\J <br /> <br />c <br /> <br />...10- <br /> <br />contended that present tidewater plante are Sf! ef1'icient as such fl <br /> <br />plant would be snd their costs are higher aIlen the cost of the ideal ste!llll <br /> <br />plent u"ed in the comparisons. <br /> <br />f,:f'ter the Yello>'stone meetinR, time wes allowed for the <br /> <br />represEmtatives of' the serreaal states, 88 well e.s the engineers for <br /> <br />both partiee, to make further studies of the problem of cost, and en <br />.( <br />unsuocel!ls1'u1 ettem.pt was made to reooncile the differences in tund- <br /> <br />8'11entnl aR=ptions between the p,roupe of engineers. <br /> <br />In the meant1me, the Secretary hlId executed contrects with <br /> <br />t'1e Bureau of Power anr1 Light ani! w1th t'1e Metrovol1ten l!ister District <br /> <br />which dil'!pOsed of certain of thl'l questions thnt hed been subjects of <br /> <br />negotiation. '.ehe contract with the Bureau of Por:er end Li~ht provides <br /> <br />that the Bureau will <br /> <br />1) build a third transmission cir~iit; <br /> <br />2) take or pay for (water being made available by the <br />United Stetes) at secondary retes the f'ollowi!1r, <br />P~llounte of energyl <br /> <br />19'J1-lP <br />1940-41 <br />19J,1-42 <br />1942-45 <br /> <br />385,000,000 K\'iW <br />490,000,000 " <br />595,000,000 ~ <br />700,000,000 "eech year <br /> <br />for pro rata for leeI'! then a full year. <br /> <br />end the Uui';ed stetee e~ees <br /> <br />1) to provide water for generetin" sueh edr11tionnl energy <br />it' the lime ill available within the teme of' the orip,inal <br />leMe end the Coloredo River ComPa:Uf <br /> <br />2) to permit the repayment of cost of machinery in the <br />term of the leeee iust ee.d of rl thin 10 yeers; <br /> <br />;\) r,ive t'1e Bureau 81'! eedr,nor of tee contrects or the <br />L08 Jiruselee Gat' & Electric Corporation the l.IlIlIlle <br />""'1.1111 up. ell other contractors; <br />