Laserfiche WebLink
<br />Water Year 1992 <br /> <br />Navajo Reservoir should fill in 1992. Releases from the <br />rese"oir will be held ncar 600 cfs through the fall and winter <br />months and large releases will be made in May and June in <br />order to provide better spawning conditions for endangered <br />fL<h located in the San Juan River. Additionally, specific <br />releases will be made from the reservoir in order to study <br />habitat requirements of the endangered fish. These specific <br />releases will be part of a seven'year studyofthe habitat needs <br />ofthe endangered ftsh in rhe San Juan Rher Basin conducted <br />by the United States Fish and Wildlife Service. After the study <br />period. the data collected will be used to determine flow <br />requirements for these fish. <br /> <br />ACTUAL STORAGE 1991 <br /> <br />THOUSAND ACRE-FEET <br /> <br />'80 <br /> <br />0 I <br />0 ,,/ <br /> .-/ <br /> / <br /> I I I <br />0 I <br /> I <br /> <br />180 <br /> <br />140 <br /> <br />120 <br /> <br />1000 <br />ONDJFMAMJJAS <br /> <br />12 <br /> <br />PROJECTED RELEASES 1992 <br /> <br />THOUSANO M:RE-FEET <br />'00 <br /> <br />PAoe I.... <br /> <br />willT PR . <br /> <br />PA II WAX .e- NIIP <br /> <br />300 <br /> <br /> <br />200 <br /> <br />100 <br /> <br />o <br /> <br />.J <br /> <br />PROJECTED INFLOW 1992 <br /> <br />THOUSAND ACAiO-FEET <br />..0 <br /> <br />PAOI 11<1 <br /> <br />101 ITPR II tPR IIWAlC <br /> <br />.00 <br /> <br /> <br />300\ <br /> <br />200 <br /> <br />I I <br /> <br />100 <br /> <br />o <br /> <br />PROJECTED STORAGE 1992 <br /> <br />THOUSAND ACRE-FEET <br />1800 <br /> <br />... PROI "'" -" 8T P OB 0-" '"' <br /> ---- 7' <br /> /' ./ <br /> ....... <br /> I ......... ......., <br /> I , <br /> I <br /> <br />HIOO <br /> <br />1400 <br /> <br />1200 <br /> <br />1000 <br />ONDJFMAMJJAS <br />