My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP10676
CWCB
>
Water Supply Protection
>
Backfile
>
10001-10999
>
WSP10676
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 3:14:14 PM
Creation date
10/12/2006 4:27:39 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8200.766
Description
Gunnison River General
State
CO
Basin
Gunnison
Water Division
4
Date
1/1/3000
Author
Unknown
Title
Gunnison-Arkansas - Various Data Regarding Aspen Reservoir Site-Etc
Water Supply Pro - Doc Type
Data
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />9. <br /> <br />fll;~59.' <br />....,) _ ._'1 <br /> <br />CHARGES AND BENEFITS <br /> <br />Permissible Water Ch8.rges <br /> <br />The present charges per 1,000 gallons consumed varies from Rbout <br /> <br />5 cents per 1,000 to as high as 25 cents per 1,000 gallons. This is the <br /> <br />cost to the consumers for municipal water supplies. For metered systems the <br /> <br />water much higher than for non-metered systems except in the case of small <br /> <br />industrial consumers. <br /> <br />A comparison of the charges for the two metered systems in the val- <br /> <br />ley is shown below: <br /> <br />CITY OF ROCKY FORD WATER SYSTEM <br /> <br />",..., <br /> <br />500 gallons <br />2nd 500 gallons <br />2nd 1000 gallons <br />3rd 1000 gallons <br />4th 1000 gallons <br />5th 1000 gallons <br /> <br />$1.00 <br />.50 <br />.50 <br />.30 <br />.30 <br />.20 <br /> <br />All in excess of 5,000 gallons lap per 1,000.gallons. <br /> <br />CITY OF COIDRADO SPRINGS WATER SYSTEM <br /> <br />Urban <br /> <br />MinimUI!l - pe r mete r pe r month <br /> <br />10.01 <br />9.01 <br />8.01 <br />7.0p <br />6.0p <br />75.01 <br /> <br />First 750 eu.ft. used per month, per 100 cu.ft. <br />Next 1250 cu.ft. used .per month, per 100 ou.ft. <br />Next 2000 eu.ft. used per :nonth, per 100 cu. ft. <br />Next 4000 eu.ft. used per month, per reo cu.ft. <br />Excess of 8,000 cu. ft per mo.. per 100 cu. ft. <br /> <br />Outside City - Fringe Territory <br /> <br />First 1000 cu.ft. used pe r month, per 100 eu.ft. 14.01 <br />Next 1000 cu. !'t. used per month, per 100 cu. ft. 12.51 <br />Next 1000 cu. ft. used per month, per 100 cu. ft. 11.01 <br />Next 1000 cu. ft. used pe r month, per 100 ou. ft. 9.5"- <br />Next 4000 cu. ft. used per month, per 100 cu. ft. 8.01 <br />Excess of 8,000 cu. ft.per month, per 100 cu. ft. 7.5p <br />Minimum - per meter per menth $1.25 <br />
The URL can be used to link to this page
Your browser does not support the video tag.