My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP10622
CWCB
>
Water Supply Protection
>
Backfile
>
10001-10999
>
WSP10622
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 3:13:56 PM
Creation date
10/12/2006 4:25:34 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.100.50
Description
CRSP - Power
Basin
Colorado Mainstem
Date
11/15/1960
Author
Engineering Comm.
Title
Revenue Requirements of Colorado River Storage Project Transmission System
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />I <br />I <br />I <br />I <br />I <br /> <br />i <br /> <br />C <br /> <br />UTAH POWER & LIGHT COMPANY <br /> <br />o <br /> <br />P <br />Y <br /> <br />P.O. Box 899 <br /> <br />Salt Lake City. Utah <br /> <br />E.A.Hunter <br />To The President <br /> <br />September 16. 1960 <br /> <br />Mr. J. K. Cummings <br />U. S. Bureau of Reclamation <br />32 Exchange Place <br />Salt Lake CLty, Utah <br /> <br />Dear Mr. Cummings: <br /> <br />, <br /> <br />At our meeting with you on September 9. 1960, we <br />promised to give you an estimate of the cost of wheeling <br />Central Utah energy to a load center in Utah County near <br />Springville. <br /> <br />You have informed us that there will be three <br />Central Utah power plants with 61 megawatts of capacity, the <br />lower of which will be near the confluence of Diamond Fork <br />and Spanish Fork River. <br /> <br />Based on annual energy to be wheeled of 292 million <br />kilowatt-hours. your estimate of Central Utah generation. we <br />recommend that you use a wheeling charge of .15 mills per <br />kilowatt-hour. This estimate is based on building a 138 kv <br />line from the lower plant to connect with our system near <br />Springville. <br /> <br />Is! E. A. Hunter <br />
The URL can be used to link to this page
Your browser does not support the video tag.