My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP10622
CWCB
>
Water Supply Protection
>
Backfile
>
10001-10999
>
WSP10622
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 3:13:56 PM
Creation date
10/12/2006 4:25:34 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.100.50
Description
CRSP - Power
Basin
Colorado Mainstem
Date
11/15/1960
Author
Engineering Comm.
Title
Revenue Requirements of Colorado River Storage Project Transmission System
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />I <br />I <br />I <br />I <br />I <br /> <br />EFFECT ON PREFERENCE CUSTOMERS <br /> <br />11 <br /> <br />The most recent utility wheeling offers available are applied to the load and <br /> <br />resource, data made available by the Bureau of Reclamation. and amortization. opera- <br /> <br />tion and maintenance. and replacement costs associated with the two alternate systems <br /> <br />are all tabulated in Tables II and III to show annual revenue requirements for the <br /> <br />respective systems. A comparison of the utilities' proposed combined system costs <br /> <br />with the all-federal system costs is shown in Table I below, and the supporting <br /> <br />data are contained in the appendix of this report. This comparison of revenue <br /> <br />requirements for the two systems shows that the utilities' combined system is <br /> <br />$492 million more costly over the 100-year study period. <br /> <br />TABLE I <br /> <br />TOTAL COST COMPARISON OF ALL-FEDERAL <br />AND COMBINED PRIVATE-FEDERAL SYSTEMS <br /> <br />Federal Portion of Investment <br /> <br />All-Federal System <br /> <br />production <br />Transmission <br /> <br />$ 505,565,000 <br />168,345.000 <br /> <br />$ 673,910,000 <br /> <br />Total Investment <br /> <br />U.S.B.R. Charges: <br /> <br />First 50 Ye,ars <br />Interest & Invest. Repayment <br />O.M.& R. <br />Private Utility Wheeling Charge <br /> <br />$1.162.995.000 <br />, 323,299.000 <br /> <br />Subtotal <br /> <br />$1,486.294,000 <br /> <br />Second 50 years <br />O.M.& R. <br />Private Utility Wheeling Charge <br /> <br />$ 347.800.000 <br /> <br />Subtotal <br /> <br />$ 347,800,000 <br /> <br />TOTAL REVENUE REQUIREMENTS <br /> <br />$1.834,094,000 <br /> <br />Combined System <br /> <br />$ 505,565,000 <br />57,770,000 <br /> <br />$ 563,335,000 <br /> <br />$ 971.798.000 <br />269.281.000 <br />385~275.000 <br /> <br />$1,626,354,000 <br /> <br />$ 287,550.000 <br />412,252,000 <br /> <br />$ 699,802.000 <br /> <br />$2,326,156,000 <br /> <br />Difference <br /> <br />$492,062,000 <br />
The URL can be used to link to this page
Your browser does not support the video tag.