Laserfiche WebLink
<br />I <br />,I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />II <br />I <br />'I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />10 <br /> <br />50 years. As a matter of fact. the 1958 Bureau payout study covers the period <br />necessary to show repayment of the Central Utah Project -- the greatest time <br /> <br /> <br />interval required of all the presently authorized participating projects. <br /> <br /> <br />The Bureau has recognized the probability of many other participating <br /> <br /> <br />projects. requiring a number of additional years for payout. Thus. it iscer- <br /> <br /> <br />tainly appropriate to look beyond repayment of presently authorized water <br /> <br /> <br />projects. The Bureau's measure of replacements in its 1958 analysis of the <br /> <br /> <br />Storage Project is based on a lOO-year cycle; hence. this period is used for <br /> <br /> <br />the present analysis. <br />