My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP10614
CWCB
>
Water Supply Protection
>
Backfile
>
10001-10999
>
WSP10614
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 3:13:54 PM
Creation date
10/12/2006 4:25:30 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8503.400.B
Description
Costilla Creek/Rio Grande Basin
Basin
Rio Grande
Water Division
3
Date
9/1/1965
Title
Reconnaissance Report on Costilla Project - Colorado - New Mexico
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />00 <br />(J') <br />.:;J <br />..,of <br /> <br />964-512-5 <br />964-512-16 <br />964-512-11 <br />964-512-9 <br />964-512-14 <br />964-512-18 <br /> <br />Location Map-------------------------Preceding <br />Plan of revelopment-------------------------~- <br />Costilla Dam Embankment Rehabilitation-- <br />Reconnaissance Design---------------------- <br />Amalia Damsite--Reconnaissance Design--~------ <br />Eastdale No. 1 Dam Embankment Rehabilitation-- <br />Reconnaissance Design---------------------- <br />Land Classification--------------------------- <br /> <br />1 <br />11 <br /> <br />, <br />~ <br />! <br />~ <br />, <br />I' <br />I <br />r <br />r <br />I <br />I <br /> <br />Contents (continued) <br /> <br />1.._, <br />( ..... <br />-<,,:0.. <br /> <br />Drawings <br /> <br />~ <br /> <br />~ <br /> <br />40 <br />43 <br /> <br />46 <br />57 <br /> <br />Tables <br /> <br />1 Stream Gaging Records----------------------,---uu----- <br />2 Annual Summary--Historic Condition Study--------------- <br />3 Evaporation-------------------------------------------- <br />4 Consumptive Use__,____n_n___~___u____________________ <br />5 Costilla Creek Direct-Flow Entitlement--1963 Compact--- <br />6 Summary of Pertinent Data and Average Annual Results of <br />. Costilla Creek Operation Studies-------------u----- <br />7 Annual Summary--Costilla Reservoir Operation Study-- <br />Future Conditions----------------------------------- <br />8 Annual ~JIDffiary--Costilla-Amalia Reservoirs Operation <br />Study--Future Conditions--------------------------- <br />9 Annual SummarYnEastdale Reservoir No. I Operation' <br />StudynFuture Conditi6ns __ - -- u_n_ un__ ____ _ _",___ <br />10 Canal and Lateral Capacities and Lengths-------------- <br />11 Construction Costs----------------------------~------- <br />12 Annual Operation and Maintenance Costs---------------- <br />13 Summary of Land Classe3------------------------~------ <br />14 Summary of Irrigable Area by Land Class--------------- <br />15 Summary of Irrigable and Productive Lands------------- <br />16 1962 Cropping Pattern-----------------------------____ <br />17 Summary of Size of Ownership, 1962--Served by Jaroso <br />Mutual Ditch Company------------------------------- <br />18 Projected Cropping Pattern----------------c--~-------- <br />19 Farm Budget--Summary of Income and Expense--Be~efit--- <br />Costilla Project--Area S~rved from Costilla Creek <br />(New Mexico)-- Without..project----n----u-nn---- <br />20 Farm BudgetnSummary of Income and ExpensesnBenefit __ <br />Costilla Project--Area Served from Costilla Creek <br />(Jaroso, Colorado, Area)--Without-Project----_----- <br />21 Farm Budget--Summary of Income and Expenses--Benefit __ <br />Costilla Project--Area Served by Costilla Creek-- <br />(New Mexico and Jaroso, Colorado, area)--With- <br />project-----------------------------------------___ <br /> <br />iii <br />
The URL can be used to link to this page
Your browser does not support the video tag.