My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP10614
CWCB
>
Water Supply Protection
>
Backfile
>
10001-10999
>
WSP10614
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 3:13:54 PM
Creation date
10/12/2006 4:25:30 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8503.400.B
Description
Costilla Creek/Rio Grande Basin
Basin
Rio Grande
Water Division
3
Date
9/1/1965
Title
Reconnaissance Report on Costilla Project - Colorado - New Mexico
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />m <br />VJ <br /> <br />,..., <br />t,-,:.:) <br />r "', <br />'-' <br /> <br />Contents (continued) <br />Tables (continued) <br /> <br />!2.:.. <br /> <br />~ <br /> <br />22 Farm Budget--Summary of Income and Expenses--~enefit-- <br />Costilla Project--Eastdale, Colorado--Without-- <br />Project-------------------------------------_______ 68 <br />23 Farm Budget--Summary of Income and Expenses--Benefit-- <br />Costilla project--Eastdale, Colorado--With Project- 69 <br />24 Summary of Primary Irrigation Benefits---------------- 70 <br />25 Annual Irrigation Benefits-----------~-------------___ 71 <br />26 Computation of, Amount Paid Local Labor from Project <br />Constructionn-- n_____ _____ n ---- --- -_ ______n_'._ 73 <br />2T Area Redevelopment Benefits-------------------------~- 74 <br />28 Total Annual Benef,its------nn-u_~_nn______________ 74 <br />29 Annual Economic Costs------_-----_____________________ 75 <br />30 Benefit-Cost Comparison-n-nn------n------_______n 76 <br />31 Basic Cost Estimates for Cost Allocation---c-~~------- T7 <br />32 Cost Allocation, S. C. R. B. Method------------------- 78 <br />33 Cost Allocation Summary-------------------___-~---~--- 80 <br />34 Program of Feasibility Investigations for the Costilla <br />Project------ -------------- -- -n,--7 - ---- --- ~--- -- - - 101 <br /> <br />Figures <br />1 Cerro Canal--Costilla Gage to State Line-- Curve of Loss <br />vs. Flow At Costilla--------------------------_____ 21 <br />2 Canal and Lateral Losses~-Costilla Creek System------- 22 <br />3 Culebra-Eastdale Canal--Capacity versus Seepage Loss-- 24 <br />4 Eastdale Reservoir No. l--Seepage Losses Estimate----- 25 <br />5 Costilla Reservoir Area-Capacity Curves--------------- 29 <br />6 Amalia Reservoir Area-Capacity Curves--Reconoaissance- 30 <br />7 Eastdale Reservoir No.1 Area-Capacity Curves----u--- 31 <br /> <br />ATTACHMENTS: <br />Amended Costilla Creek Compact------------------------ 1-9 <br />Report of the Bureau of Sport Fisheries and Wildlife-- 1-13 <br /> <br />iv <br />
The URL can be used to link to this page
Your browser does not support the video tag.