Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />3661 <br /> <br />$750,000,000 in construction expenditures. and the USDA <br />cost-sharing requirement to the fanner of approximately $50 <br />million. As currently planned, the mitigation plans for these <br />units would include over 12,750 acres of land. This does not <br />consider the Grand Valley Unit which will likely require <br />significant amounts of land for mitigation. Many legal questions <br />arise concerning the beneficial consumptive use of the water and <br />the redistribution of the saved water. In addition, a signifi- <br />cant increase in annual costs for the operation, maintenance, and <br />replacement of the onfarm program can be expected. <br /> <br />gl <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />I <br /> <br />~ <br /> <br />I <br /> <br />-27- <br />