Laserfiche WebLink
<br />1 <br /> <br />\ <br /> <br />Progress on SB-74 Documentation/Coordination of Resource Data bv Hvdrosphere. Inc.: <br /> <br />tI <br /> <br />Hydrosphere is currently completing work on the water supply infrastructure <br />inventory, groundwater recharge, conjunctive use, and opportunity assessment portions of <br />the study. They are also commencing work on a basin-wide computer illustration tool <br />showing impacts of various water supply, population growth, infrastructure, and water <br />use scenarios. Their schedule for completion of all project tasks is early August. <br /> <br />Progress on the State Engineer's Office Denver Basin Groundwater Model: <br /> <br />The State Engineer's Office has completed the conversion -of the steady-state <br />groundwater model to the transient model. The hydraulic head predicted by the steady- <br />state model becomes the starting head conditions for the transient model. The transient <br />model requires additional input including storage factors, hydraulic conductivity and the <br />elevations of each groundwater layer. The transient model successfully simulated a 700 <br />year period without any pumping which shows the model is stable. The final water levels <br />from the 700 year simulation are used as the starting levels for transient runs using <br />historical pumping stresses. The transient model runs are currently being completed and <br />analyzed by the SEO. <br /> <br />. <br /> <br />Peer Review GrouP Meetings Held: <br /> <br />The Technical Peer Review Group and the General Peer Review held their third <br />meetings June 23, 1997. HRS, Inc., Hydrosphere, Inc., and the State Engineer's Office <br />presented task information completed to date followed by a review by both groups. The <br />Preliminary Draft Report was also submitted to both groups for their review. Written <br />review comments will be submitted by each group for inclusion in the final S8 96-74 <br />report. The final meeting of the two peer review groups is scheduled for late August after <br />submittal of the Draft Final Report. <br /> <br />Final Studv Schedule <br /> <br />Completion of the Draft Final Report is scheduled for August. <br /> <br />Submittal of the Final Report to the Special Water Committee is scheduled for <br />September. <br /> <br />. <br />