My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP10517
CWCB
>
Water Supply Protection
>
Backfile
>
10001-10999
>
WSP10517
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 3:13:22 PM
Creation date
10/12/2006 4:21:50 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8273.100
Description
Colorado River Basin Salinity Control - Federal Agencies - Bureau of Reclamation
Basin
Colorado Mainstem
Water Division
5
Date
3/6/1984
Title
Status of Colorado River Water Quality Improvement Program and Colorado River Basin Salinity Control Project - Upper Colorado Region - Bureau of Reclamation
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />~ <br />(..'1 <br />c-; <br />o <br /> <br />. <br /> <br />. <br /> <br />7 <br /> <br />PARADOX VALLEY UNIT, COLORADO <br /> <br />1. Testing of the brine well field continues, along with monitoring of <br /> <br />Dolores River flows and conductivity and ground water and brine interface <br /> <br />readings and water level measurements. <br /> <br />2. Data collection is underway for the evaluation of possible alternative <br /> <br />geologic formation for deep well disposal of brine. <br /> <br />3. A. U.S. Department of Justice attorney mailed a draft Finding of Fact <br /> <br />and Conclusion of Law to the Colorado State Engineer for a change in water <br /> <br />right and plan for augmentation. State's attorney believes that Colorado <br /> <br />would agree with this document with a few modifications concerning <br /> <br />beneficial use of water. <br /> <br />4. In January a contract to develop four existing wells was awarded to <br /> <br />Zimmerman Well Service; work commenced on January 30. Testing of the brine <br /> <br />'well field was terminated to prepare for this work. <br /> <br />5. In January bids were accepted for geophysical data interpretation <br /> <br />contracts. Preparation continues on a work statement/contract for an <br /> <br />injection system, construction design consultant. <br /> <br />6. Award of a contract for drilling of the injection well has been delayed <br /> <br />7 months from March 1985 to October 1985. <br />
The URL can be used to link to this page
Your browser does not support the video tag.