My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP10512
CWCB
>
Water Supply Protection
>
Backfile
>
10001-10999
>
WSP10512
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 3:13:20 PM
Creation date
10/12/2006 4:21:45 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.125.H
Description
San Juan-Chama Project
State
NM
Basin
San Juan/Dolores
Date
2/1/1963
Author
USDOI/BOR
Title
Accounting of Water San Juan-Chama Project Colorado-New Mexico
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />with the governing body of the Nambe Pueblo for the opera- <br />tion and maintenance of such facilities, and the' constructiQfl. <br />Olf recreation facilities at the Heron N"WIlbered 1+, Valdez, <br />and Indian Camp Reservoirs sl:)all be contingent upon his <br />making appropriate arrangements with a State or local agen.cy <br />or organization ,for the operation andmaintenanae of those <br />facilities: PROVIDED, 'l'hat <br /> <br />"(a) the Secretary shall SOl operate the initial sta.ge <br />Olf the project a1ithorized herein that diversions to the <br />Rio (frande Valley shall 'not exceed one millian three . <br />hundred ahd fif'ty thousand acre-feet of water in any <br />!. period of t6ln eonsecative years, reckoned in continuing <br />,) progressive series starting with the first day of Oetober <br />after the project shall ha.ve commenced OJIerationl PROVIDED, <br />R0WEVER, That not tIlOre than two ht'Uldred and seventy' thou" <br />sand acre-feet shall be diverted in anyone year; <br /> <br />.,'.' <br /> <br />"(b) the Secretary shall operate the project so that <br />there shall be' no injury, impaiJ:'lllfmt, or depletion of <br />existing or future beneficial uses of water within the <br />State of Colorado,. the use of whieh is within the appOlr- <br />tionment made "\;0 the State of ColOlrado by article I!! <br />Olf the Upper ColQrll.dOl River 'iBa,sJla,c9lJlP8.Ct,c;asprwided <br />by artie1e IX of the Upper Colorado River Basin eompa.et <br />and artiOle IX of the Rio Grande compa.ct; <br /> <br />"(c) all works of the project shall be constructed so <br />as to permit compliance physically with all provisio~ <br />of the Rio Gl'ande ~oIiq?act, and all stich worksshEl.ll <br />be operated at all times in col.1f'ormity with said compact,; <br /> <br />"(d) the amount of water d:l.vertedin the Rio G:t;'a.nde <br />Basin for uses served by the San Jtta.n-Chama Project <br />shaJ.1. be uini ted in a:rry calendar year to the amount of <br />imported water available '00 such uses f.rom importation <br />to and storage in the Rio Grande Basin in tha.t yearj <br /> <br />If (e) details of project operation essential to acoount- <br />ing for diverted SanJue.n and Rio Grande floW's shall be <br />deVeloped through the join.t efforts of the Rio Grande <br />Clompaot CQmm:l.ssion, the Upper Colorado River Clommission, <br />t1;l;e appropriate ageM1es 01' the united Sta.tes 8nd of the <br />States of' Colorado, New Mexico, and Texas, and the vari- <br />GUS 'projeot entities. rm this conneotion the States of <br />Texas and New Mexioo shall agree, within a reasonable <br />time, on a sYstem of gaging devices and measurements to <br />seoure data necessary to determine the present effects <br />'of tributary irrigation, as well a.s present river ohannel <br />losses: PROVIDED, That if' the State of Texas shall req\1ire, <br />as a oondition preoedent to such agreement, gagi~ devioes <br />. <br /> <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.