My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP10500
CWCB
>
Water Supply Protection
>
Backfile
>
10001-10999
>
WSP10500
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 3:13:16 PM
Creation date
10/12/2006 4:21:29 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.110.A
Description
Bostwick Park Participating Project
State
CO
Basin
Gunnison
Water Division
4
Date
6/1/1963
Author
Kuiper L. R.
Title
Statement to Projects Committee National Rivers and Harbors Congress
Water Supply Pro - Doc Type
Project Overview
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />~~) <br /> <br />"'-\\, <br />;~;:~~;; <br /> <br />Authorizing legislation for this project has been introduced <br /> <br />in both Houses of Congress. The project is unanimously supported by <br /> <br />the entire Congressional delegation of the state of Colorado. Field <br /> <br />hearings were held on this project by the Irrigation and Reclamation <br /> <br />Subconunittee of the House Conunittee on Interior and Insular Affairs <br /> <br />in Montrose, Colorado, on April 19, 1963. It is anticipated that <br /> <br />further hearings will be held in Washington, D. C. in the very near <br /> <br />fu ture. <br /> <br />A feasibility report on this project has been completed by <br /> <br />the Department of the Interior and a copy of the report transmitted <br /> <br />to the Honorable John W. MCCormack, Speaker of the HOllas of., Represent- <br /> <br />atives. The report has been referred to the Committee on Interior <br /> <br />and Insular Affairs and is printed with .illustrations in HOuss.DOcu- <br /> <br />ment No. 487, 87th Congress, 2nd Session. <br /> <br />The estimated annua,l economi,c,benefits for the Bostwick <br /> <br />Park Project would total $318,300 over the lOO-yaarperiod'ofanaly- <br /> <br />sis at 2~ percent interest. The average annual benefits are.broken <br /> <br />down as follows: <br /> <br />Direct <br />Indirect <br />Public <br /> <br />$ 237,200 <br />69,200 <br />11,900. <br /> <br />Total <br /> <br />$ 318,300 <br /> <br />These are all figures contained in the project report submitted by <br /> <br />the Department of the ,In~erior. <br /> <br />The project is not revenue producing. <br /> <br />-2- <br />
The URL can be used to link to this page
Your browser does not support the video tag.