Laserfiche WebLink
<br />',', <br />d' <br /> <br />~eC~mber 1974. This will stabilize the rating Jnd also reduce ttle time <br />inv91ved In Jdjusting the gJleS to tile requIred release. Records will be <br />collected ill bottl slies for a SilO!"! period of lime for low-flow <br />cdmp<Hlson purposes. <br />. The sldlmg well') were rebuilt Jnd .1 new Parstlall flume was <br />installed on Flontier Ditch In Dee"ember ]973. <br />The AdrnlnlstrJlion approved a cooperJllve agreement With the <br />U S. Gegological Survey fOf ttle fiscal year'July 1. 1974 to June 30, <br />1975, in the amount of $24,000: $lL'.OOO fOI each party. Of these <br />funds $8,000 is for the operation of the Compact stiJtion al Lamur. the <br /><lddltlonal held work Jt the ot\'ler Compact SIJ\l01)5, tile mJintenance of <br />the fCldlQ equipment. the provldlllg of ClJr1enl stle.lmflow d.:lt.:l, .:Ind the <br />preparation of records fOf the Annuill Report. TIle remaining $16,000 <br />is for the construction of .:In urtdiciJI control at the new site far" the <br />ga91ng station Arkansas River below J,Ohl! Marlin ReserVOIr". <br /> <br />10. Findings of filct by the Administration <br /> <br />SPECIAL TELEPHONIC MEETING <br />APRIL 16. 1974 <br />A speCial telephonic meeting was held on Apnl 16. 1974, in <br />accoldance with ArtIcle V F of tile Compact, fOI tile pUlpose of <br />deClaring that the rec,clvoir would become empty on Apl"Il ]8, 1974. <br />Mr. C J. KUiper, Colorildo Stilte Engineer. .Jnd Mr. Rudy Styduhar. <br />D'VI~IOI1 Engineer. were notified of tile ,)ction ilnd tl1Jt lldrninlslrJtion <br />at decreed Willer ngh!s for ColorJdo would commence on Apnl 18. <br />1974, unless J change of conditions Justified CJncellJtlon or <br />modificJtlon of Ihls notice. <br />The leselVOII became empty J112:01 A.M., Ap111IB,1974. <br />Palticlpatlng members: <br />FOr" ColorJdo ~ Mr. Biltes ilnd Mr. Tempel <br />FOr" Kans,)s - Mr. Bentrup and Mr. Reeve <br /> <br />I <br /> <br />-9- <br /> <br />,- <br />