My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP10487
CWCB
>
Water Supply Protection
>
Backfile
>
10001-10999
>
WSP10487
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 3:13:12 PM
Creation date
10/12/2006 4:21:16 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.200.05.J
Description
Hoover Dam/Lake Mead/Boulder Canyon Project
Basin
Colorado Mainstem
Date
1/1/1949
Author
USDOI/BOR
Title
Boulder Canyon Project Final Reports: Part IV/ Bulletin 5 - Penstocks and Outlet Pipes
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />..-l <br />r-- <br />~ <br />N <br /> <br />x <br /> <br />CONTENTS <br /> <br />o <br /> <br />CHAPTER II-HYDRAULIC AND ECONOMIO <br />STUDIES-Oontinued <br /> <br />ECONOMIC CONSIDERATIONS <br />Section Page <br />29. Hydraulio losses___n__n___h_n__nn_____ n _____n_________ 39 <br />30. Assumed load faotor_hn__n__n__n_n____n__n__nnnn___ 40 <br />31. Frictional head 10ss_nnn___hn_____n_____h_n__n___n___ 40 <br />32. Maintenance costs____h_______nnn__h_____U_______h_____ 41 <br />33. S~-------------------------------_____________________ 42 <br /> <br />OTHER CONSIDERATIONS <br /> <br />34, Struotural feasibility - _ h ____h_n__hn_n_n__n__hn_____n 45 <br />35. Feasibility demonstrated by models__nn__n__h_____h___n_n 46 <br />36. Investiga.tion of wa.ter-hammer_________h_____h__h_h_____~__ 47 <br />37. Conclusions_ - - - __ __on n h - n_ n ___ - n _ _n _ n _ n _ _ __ n_ _ n ___ 48 <br /> <br />MODEL AND PROTOTYPE DATA <br /> <br />38. Introduotion_ - - --_n__n______n__n__n____n__n_n_n_____ 48 <br />3-9. Desoription of tests___-hn--__n-_nnn_____h_n____n_n__ 49 <br /> <br />CHAPTER III-DESIGN OF PIPE SHELL, SUP- <br />PORTING SYSTEM, AND GIRTH JOINTS <br /> <br />INTRODUCTION <br />40. General desorlption_n____n_n__n___n___h_n__n____nn___ .59 <br />41. Design of pipe shell_ _ hnn__n_n__h_nn__n__n_n_n_n__ 59 <br />42. Thiokness and weight of shell_____hh_n__n_n_n________n___ 60 <br /> <br />DESIGN OF SUPPORTING SYSTEM <br />43. Introduotionu__n_____h__h_n____ n_h_____h______ _______ 61 <br />44. Stilfener ring_h_n__h__h_h_n_h__h_h_h__h____h______ 61 <br />45. Fillet insertu hu___n__h__hhn___h_____U_h_____h_____ . 61 <br />46. Supporting braok~ts---nuh-h-h-------n______u__un_____ 63 <br /> <br />PIPE IN LONGITUDINAL FLEXURE <br />, <br />47. Introduction_ _ h .hn______h_h_n_n__h_h_____n__hhn_ 65 <br />48. Buckling stress under axial compressiOD________...___h_____n__h_ 66 <br />49. Tests of axially compr~ed cylinder_____Uh__...hh_____h_h___ 66 <br />50. Buokling test on 48-inoh pipe___h__h_h_h___uh__u_h___c__ 67 <br /> <br />MODEL TESTS OF PENSTOCK HEADER' <br /> <br />51. Introduction_ - - -_h__h__h_U_hn__h__h______h_h_hn__ 72 <br />52. Tests on 48-inch model. hh____nUh_____h__h_________Uh_ 72 <br />53. Tests on 6o-inch model number L _n___hh_nU_h_n_____h__ 75 <br />64. Tests on 6O~inch model number 2_hh__h_h__h_h_h_____h_~ 75 <br />55. Tests on 6O-inch model number 3_ -_______h_______nh_h______ 80 <br /> <br />STRESSES IN PIPE SHELL <br /> <br />56. Stress conditions_________ ______ __________ ____~___________h__~ 82 <br />57. Combined Stresses_h_nh_h_h_h_____nnn_____h__h_nn_ 82 <br />
The URL can be used to link to this page
Your browser does not support the video tag.