Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />2.3 TARGET OBJECTIVES FOR PLAN COMPONENTS <br /> <br />'.~~~) <br /> <br />It should be noted that the target objettives stated in the previous <br />section apply to the recommended plan that is developed during the course of <br />the study and not necessarily to plan components. Individual plan components <br />will be identified to meet one or more of the target objectives but the <br />alternative project plans should meet the maximum number of target objectives <br />to the maxi~~m practicable degree. <br /> <br />to- <br /> <br />(,,) <br /> <br />(_.\ <br /> <br />N <br /> <br />2.3.1 Structural Components <br /> <br />Structural components will be identified to satisfy one or more of the <br />project target objectives stated above. For example, multi-purpose reservoirs <br />will be identified to meet specific agricultural, M&I, and recreational needs; <br />hydroe 1 ectric components wi 11 be i dent ifi ed to provi de a potenti a 1 mechani sm - <br />for financing; and so forth. Structural components, therefore, do not have a <br />sub-set of target objectives but will be identified to meet objectives 1, 3, 4 <br />and 5 for alternative plans. <br /> <br />2.3.2 Non-Structural Components <br /> <br />Non-structural components are grouped <br />water conservation measures, water management <br />components. <br /> <br />into the <br />measures, <br /> <br />following categories: <br />and recreation-related <br />.~~~8v-- <br />______________ .,;;tv c-1 <br /> <br />---_._--~~---------- <br /> <br />//;.3.2.1 Water Conservation Measures C~.lA'- ~ 1'/141) <br />i <br />, <br /> <br />~i <br /> <br />The target objective for these components is: <br /> <br /> <br />ck~ <br />Reduce present 'CQI t~mfl1;i... -uell in the study <br /> <br />amount, more than ten percent in aggregate. <br /> <br />area by a significant <br /> <br />~ <br /> <br />_/ <br /> <br />--------- -- -- ------ - -- - ----- -----~- -~ -----------~_...~---_.- <br /> <br />2.3.2.2 Water Management Measures <br /> <br />The target objective for these components is: <br /> <br />Meet present or projected water demands by some practical means which <br />will eliminate or defer the need to construct new physical <br />facil ities. <br /> <br />2-2 <br />