My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP10458
CWCB
>
Water Supply Protection
>
Backfile
>
10001-10999
>
WSP10458
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 3:13:02 PM
Creation date
10/12/2006 4:20:34 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8210.110.60
Description
Colorado River Water Users Association
Basin
Colorado Mainstem
Date
12/1/1960
Author
CRWUA
Title
Proceedings of the 17th Annual Conference
Water Supply Pro - Doc Type
Annual Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />with those for the Vernal-Oak Creek segments in one construction <br />invitation. Target date for completion of this Flaming Gorge-Green <br />Mountain transmission intertie is June 1962. <br /> <br />, <br /> <br />The first leg of the Glen Canyon-Four Corners-Curecanti <br />line will be a steel tower 230-kv transmission line between the Glen <br />Canyon Dam and the Four Corners area in northwestern New Mexico. <br />Another leg of this line 1lit,ill be extended from the Four Corners area <br />northward to Colorado to the Curecanti powerplant of the Colorado <br />River Storage Project. The Glen Canyon-Four Corners leg of the <br />230-kv line will be under contract during the first half of calendar <br />year 1961 and the Four Corners-Curecanti portion will be under con- <br />tract during the last half of calendar year 1961. Construction of both <br />of these lines is scheduled for completion by January 1964, <br /> <br />Design work is proceeding in connection with the substations <br />associated with the transmission lines now under construction and <br />award of contracts for construction of substations will be made during <br />the fiscal year opening next July 1. <br /> <br />Everyone is aware that there is a trespass problem on the <br />Lower Colorado River, and that the Justice Department has initiated <br />certain legal action in connection with this problem. Everyone also is <br />aware that considerable attention is now being given to a land-use pro- <br />gram that will take account of the needs of the Federal Government <br />and will best serve the needs of all the people of the Nation. A meet- <br />ing has just been concluded in Washington at which several proposals <br />were thoroughly aired. <br /> <br />Aerial photographs were taken during 1960 of the bottom lands, <br />roughly from bluff to bluff, embracing nearly 1,000 square miles. Also, <br />in cooperation with the Bureau of Land Management, a long-needed <br />cadastral survey of Colorado River lands now is underway. <br /> <br />So much for current problems. Let us, now, turn our attention <br />to the future, with a review first of basin investigations. <br /> <br />It has been apparent for many years that the potential uses and <br />requirements for waters of the Colorado River system greatly exceed <br />the available water supply, Long ago it was recognized that it would be <br />necessary for a program to be developed which would provide the most <br />effective and efficient use of the available water supply of the system. <br /> <br />To this end a comprehensive basin-wide investigation was made <br />which inventoried the existing and potential water uses in both the Upper <br /> <br />- 23 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.