Laserfiche WebLink
<br />Table 8. Major raceway culture facilities for production of Colorado River <br />fishes-number, size and cost. <br /> <br />Item Description Size or Number Unit Cost Total Cost <br />Raceways 8'Wx80'L 5 $ 500/ft. $200,000 <br />Raceways 6'Wx60'L 10 500/ft. 300,000 <br />Ponds 0.25-0.5 ac 10 67,OOO/ea. 670,000 <br />Hatchery bldg. 38'x52' 1976 sq. ft. l35/sq.ft. 266,760 <br />Laboratory in hatchery bldg. 150 sq. ft. 150/sq.ft. 22,500 <br />Storage bldg. block 200 sq. ft. 90/sq.ft. 18,000 <br />Combination bldg. office, shop <br /> garage (3 stalls) 1624 sq. ft. l20/sq.ft. 194,880 <br />Residence 3 bedrooms 4 65,000/ea. 260,000 <br />Wells 10" 3 30,000/ea. 90,000 <br /> Total Cost $2,022,140 <br /> Engineering (30%) 606,642 <br /> DFC (15%) , 303,321 <br /> $2,932,103 <br /> <br />16 <br />