Laserfiche WebLink
<br />Table 7. Major pond culture facilities for production of Colorado River <br />fishes-number, size and cost. <br /> <br />Item Description Size or Number Unit Cost Total Cost <br />Ponds I-acre 25 $50,000/ea. $1,250,000 <br />Ponds 0.1-0.25 acre 10 67,000/ea. 670,000 <br />Holding house 38'x52' 1976 sq. ft. laO/sq. ft. 197,600 <br />Laboratory in holding house 150 sq. ft. l50/sq. ft. 22,500 <br />Storage bldg. metal 200 sq. ft. 50/sq. ft. 10,000 <br />Combination bldg. 28'x58' <br /> 3 stall garage <br /> office ship 1624 sq. ft. 120/sq. ft. 194,880 <br />Residences 3 bedroom 4 65,000/ea. 260,000 <br />\VeIls 10" 3 30,000/ea. 90,000 <br /> Total Cost- $2,694,980 <br /> Engineering (30%) 808,494 <br /> DFC (15%) 404,247 <br /> $3,907,721 <br /> <br />15 <br />