My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP10444
CWCB
>
Water Supply Protection
>
Backfile
>
10001-10999
>
WSP10444
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 3:12:58 PM
Creation date
10/12/2006 4:20:26 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8441.400
Description
Colorado Big Thompson Project - Reports
State
CO
Basin
South Platte
Water Division
1
Date
8/1/1986
Author
Colo. Water Resource
Title
Summary Report - Preliminary Hydrologic Analysis
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />r a <br /> <br />iO <br />r~\ Z~ <br />,'" CJl <br />" ~l <br />Ii sites. <br /> <br /> <br /> <br />[' <br /> <br />';':;X <br /> <br />.,"] <br /> <br />I <br /> <br />',-J <br /> <br />! 1 <br />F'"{ <br />1<'1 <br /> <br />L <br />E~ <br />j' <br />, , <br /> <br />;, ,~ <br /> <br />1 <br />"'-' <br /> <br />r: <br /> <br />r <br />,':".' <br />, <br />r' <br /> <br />'-,> <br /> <br />]'" <br /> <br />,~; o' <br />'( ~ <br /> <br />:;::., <br /> <br />"1':; <br />r <br /> <br />] <br /> <br /> <br />I <br /> <br />~'" . <br /> <br /> <br />that would <br /> <br />not. be suitable <br />,be eliminated. <br /> <br />as <br />The <br /> <br />a j oint use. or replacement <br />nine reservoir sites were: <br /> <br />::<.'1 <br />;':':) <br /> <br />reservoir were to <br /> <br />. <br /> <br />Wolford Mountain Site A on MUddy Creek. <br />Wolford Mountain Site C on Muddy Creek <br />Red Mountain on theColoradq River <br />Azure on the colorado River <br />WOlcott on Alkali Creek <br />Una on the Colorado River <br />Haypark on East Troublesome Creek <br />L6werPiney on the J?ineyRiver <br />Iron, Mounta1non Homestake Creek. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />.. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />Asa result of the Pha:se 1 -investigation, Haypark; Lower Piney and <br />Iron Mountain sites were eliminated from further consideration <br />because of. limited water yield or geotechnical p;t"oblems. The <br />Wolford Mountain site A w.as replaced with. a site approximately <br />3,500 feet up:stream. This.new site, designated as Wolford Mountain <br />.Site A', appears to be more favorable for dam construction in light <br />of geotechnical and topographic iterations. The Initial Screening <br />Report, issued in . January, 1986, describes in detail the efforts <br />and recommendations made in the Pha:se 1 investigation. <br /> <br />Phase 2 involves ,two. aspects: in-depth hydrologic,. operational and <br />water rights anl"llyses using a hydrologic :simulation model, and.. an <br />evaluation of the Green Mountain to Dillon. conveyance system to <br />determine the, pumping :system configuration and the estimated cost. <br />This memorandum presents ,the reSults of these preliminary analyses <br />performed as part of the Phase 2 investigation. <br /> <br />During Phase 3, the reconnaissance study phase, preliminary designs <br />and cost estimates will be prepared for those reservoir sites not <br />eliminated as a result of the Phase 2 analyses. In addition, <br />detailed geoteChnical. investigations will . be conducted . if <br />necessary. The Phase 3 report, will present a comparative analysis <br />of these remaining. sites. A final report will then be prepared <br />1-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.