My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP10444
CWCB
>
Water Supply Protection
>
Backfile
>
10001-10999
>
WSP10444
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 3:12:58 PM
Creation date
10/12/2006 4:20:26 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8441.400
Description
Colorado Big Thompson Project - Reports
State
CO
Basin
South Platte
Water Division
1
Date
8/1/1986
Author
Colo. Water Resource
Title
Summary Report - Preliminary Hydrologic Analysis
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />\S'~' <br /> <br />[ <br />l'lg <br />l;'i Z~ <br />'I <br />)CJ' <br />I 0) <br /> <br />I' <br /> <br />, <br /> <br />I <br /> <br />L <br /> <br />fj <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />l <br />I <br /> <br /> <br />~ . '. <br /> <br />','. <br /> <br /> <br />which will incorporate the results of the evaluations, relating' to <br />the storage sites anC1 the conveyance facility. <br /> <br />1.2 HYDROLOGIC ANALYSIS OBJ~CTIVE <br /> <br />The main pu:r-pos.e.ofthe Phase 2 hydrologic analysis . is to estimate <br />the yield fro~ each reservoir site and the amount of water <br />exchangeable under the implementation of the Green Mountain <br />Exchan~e Project. In accOrdance with the Plan of study dated June <br />20, 1985, th<;i!followiriganalyse,s were made: <br /> <br />.. <br /> <br />A water rights analysis wa$ made to e$timate the monthly <br />flows physically and legally 'available for s:torageat six <br />. sites for the.1951 to 1983 hy-drologic stUdy perioc:l. The <br />analysistva$lperforllled for existing condi tibns al'ld two <br />levels of future development of conditional water rights. <br /> <br />. <br /> <br />A reservoir operation analysis was performed to estimate <br />the firm annual yield of each reservoir site. In <br />consultation with' the Authority, the firltl annual yield <br />was defined as the volume of water that can be provided <br />every year without any shortage. <br /> <br />. <br /> <br />The Green Mountain Reservoir waa analyzed in <!letail to <br />estimate its yield based on existing operating policies' <br />and onexistingColoraao River operations. The amount of <br />exchangeable water available for the Green Mountain <br />.Exchan~e project was also deterltlined. <br /> <br />To facilitate the computations involved in hydrologic and water <br />rights data management,. and to. perform a reservoir operation <br />analysis, a monthly hydrologic simUlation .model was used which <br />incorporates the Colorado wcite.rrights. priority system and other. <br />legal and institutional arrangements identified during the. study. <br />The, modeling area Covers the Upper. Colorado .Basin above the Cameo <br />gage. <br /> <br />1-3.. <br />
The URL can be used to link to this page
Your browser does not support the video tag.