Laserfiche WebLink
<br />,,:,,; <br />.."/, <br /> <br />Ii <br /> <br />. , <br /> <br />I, <br />:.1 <br /> <br />Ii <br />f> <br /> <br />I <br /> <br />:'j <br /> <br />I;;j <br />J.: <br />tt:~ <br />;-t:! <br />ljl <br /> <br />,l, <br /> <br />'[ <br /> <br />:;; <br /> <br />~. -~ <br />i" <br />J, <br /> <br /><<-, <br /> <br />r <br /> <br />.~..; <br /> <br />J <br /> <br />:1 <br /> <br />"\ <br /> <br />'I <br />>1' <br /> <br />I <br /> <br />I <br />. , <br /> <br />I <br /> <br />I <br /> <br />o <br />o <br />'e-> <br />~Azure site - This site is located en the Colorado. River at the <br />;l.:>.upper end of the Lower Gere Canyon, abeut 10 miles downstream from <br />Kremmling. The average. annual historical flew at. this. site is <br />742,000 af. <br /> <br />Wo.lcett sit~ -. This site is located 1 mile north of the town of <br />WOlcott on Alkali Creek, a .miner tributary toth,e Eagle River. Two <br />alternatives were analyzed. The first involves pumping from the <br />Eagle River and-the Colerado River. The other alternative provides <br />. a smaller reservoir capaoity with pumping' from the Eagle River <br />Only. The" average annual histerical flow is 800 .,afforAlkali <br />Cr$ek at. the reservoir site; 277,000 af at the Eagle River <br />div,ersion site: and 796,000 af at the Colorado. River diversion <br />site. <br /> <br />Una site This site is on the Colorado River at the Mesa <br />Garfield county line between the towns of paraohute and DeBeque. It <br />is downstream from the Shoshone power plant diversio.n but lies <br />upstream frem the Grand Valley diversiens. Because of its <br />geegraphic location, the Una site alone weuld not substitute fer <br />the. functions of the Green Mountain Reservoir as specified in <br />SenateOecument 80 and the Consolidated cases. However, the. <br />reserveir has merits in providing the largest water yield and <br />hydreelectric power production. An evaluation waS made of its <br />capability to replace the Greert Mountain Reservoir when combined <br />with one Of the upstream reservoirs mentioned above. The average <br />annual hist.orical flow at this. site is 2, 59? , 000 af. <br /> <br />Combination Res~rv,oirs - with the exception of Wolcott Reservoir, <br />the single reservoirs can not meet the. requirements of a <br />replacement reservoir for the Green Mountain EXChange Project due <br />to their limited yield or geographical location. Several <br />al ternatives were considered using a oombinatien of two reservoirs. <br />to meet the proj.ect objectives. Among them are the fOllewing <br />combinatiens: . <br /> <br />3-3 <br />