Laserfiche WebLink
<br />123:) <br /> <br />Reservoir ~ratian <br /> <br />water in Pueblo Reservoir is either project water or water stored under <br />conract with other entities. <br /> <br />. <br /> <br />water stored under contract will be released an order of the Divisioo <br />Engineer. <br /> <br />If project water is made available to the Southeastern Colorado Water <br />Conservancy District, the delivery will be made fran either Pueblo <br />Reservoir or upstream storage. <br /> <br />I <br />~ <br /> <br />Table 6 and Exhibit 10 show the proposed. operation of Pueblo Reservoir <br />in Water Year 1979. <br /> <br />'lWin Lakes and Mt. Elbert Purg;>ed.-Storage Powerplant <br /> <br />Testing of the equiprent in Mt. Elbert PuI1ped-Storage Powerplant has <br />been delayed until April 1979. 'lb make this test, project storage in <br />'lWin Lakes will have to be approx:illlately 20,000 acre-feet to provide for <br />the inactive pool in 'lWin lakes and the forebay. About 10% of needed <br />project storage has been acCUllUJlated to date and the balance will be <br />stored by exchange durinq water year 1979. <br /> <br />Fifty percent of the required water had been stored, but this was reduced . <br />to 10% when the water was used to rreet ccmnitIrents during the closure of <br />Sugar loaf Dam for construction IIOrk on the Mt. Elbert Conduit. <br /> <br />" <br /> <br />. <br /> <br />14 <br />