My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP10408
CWCB
>
Water Supply Protection
>
Backfile
>
10001-10999
>
WSP10408
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 3:12:47 PM
Creation date
10/12/2006 4:18:54 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8541
Description
San Luis Valley Project
State
CO
Basin
Rio Grande
Water Division
3
Date
11/1/1950
Title
Monthly Progress Report
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />.. '100- <br /> <br />. <br /> <br />. <br /> <br />Conservancy District. The meeting was attended by R. J. Tipton, <br />Colorado Water Conservation Board, R. S. Bristol, Regional Supervisor <br />o & M, S. L. lla.ird, Regional Counsel, and W. H. Sweet, Project Engineer. <br />It was the consensus of the group that application of the formula <br />would involve no difficulties. Mr. Tipton thought studies had been <br />made which would show, on the average, the applicability of the formula. <br />He agreed to ascertain whether or not such studie s had been made a.nd <br />to inform the Bureau of the results of the studies. <br /> <br />The Project Engineer discussed, with Dr. H. C. Meyers, <br />President, Board of Directors of the Conejos Water Conservancy District, <br />the securing of "Consent Agreements." Dr. Meyers gave indication of <br />being uninterested, but did promise to consult with the Board's <br />attorney as to required actions of the Board. The Conejos Board of <br />Directors has no ,Vice-President at this time due to the expiration <br />of the term of Mr. John Brady. The District Judge has appointed Mr. <br />Thompson of Romeo. Colorado to the vacancy. <br /> <br />The Project Engineer, with the aid of Mr. C. S. Birkins, <br />former secretary of the Conejos Board, will encourage the Board and <br />prominent water users in the Conejos District to initiate the work <br />of securing the consent agreements in order that requirement can be <br />completed early in 1951. <br /> <br />Construction work on Platoro Dam and Reservoir was stopped, <br />for the season, the latter part of the month due to cold and stormy <br />weather. Completion of the dam and clearing of the reservoir is ex- <br />pected by October 1, 1951. <br /> <br />General <br /> <br />Meurs. Draney and Hicklin visited the project to inspect <br />the new work order and accounting system. <br /> <br />The Regional Safety Advisor made an inspection trip over <br />the project during the month. Efforts to secure a Safety Inspector <br />for part time employment on the project are being made. A suggestion <br />for the emplOfl1lent of a quaJ.ified man have been made to the Regional <br />office. <br /> <br />f' "... ~ {" ~'; ~ <br />, .' <br />....' ~ ,';" (., t ~..l <br />
The URL can be used to link to this page
Your browser does not support the video tag.