My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP10376
CWCB
>
Water Supply Protection
>
Backfile
>
10001-10999
>
WSP10376
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:58:37 PM
Creation date
10/12/2006 4:17:46 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8276.300
Description
Lower Gunnison Basin Unit - Colorado River Basin Salinity Control Project
State
CO
Basin
Colorado Mainstem
Water Division
4
Date
10/1/1981
Title
Lower Gunnison Basin Unit Feasibility Report and Proposed Draft E.I.S.
Water Supply Pro - Doc Type
EIS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />{~~* <br /> <br />CHAPTER VI <br /> <br />{;:~~1 <br /> <br />CHAPTER VII <br /> <br />CONTENTS (Continued) <br /> <br />Formulation of alternative plans (continued) <br />Alternative plans (continued) <br />Land retirement (continued) <br />Retire 12,000 acres of nonarable land <br />with no improvements . . . . . <br />Retire 12,000 acres of nonarable land and <br />concrete line all canals and laterals <br />Retire 12,000 acres of nonarable land and <br />line deteriorated sections of canals and <br />laterals on both sides of the valley . . <br />Retire 12,000 acres of nonarable land and <br />concrete line deteriorated canal and <br />lateral sections on the east side of <br />the valley . . . . . <br />Sprinkler irrigation .. . . <br />Future without condition <br />Evaluation of alternative plans <br />Candidate plans <br />Plan A-I <br />Plan A-2 <br />Plan B <br />Plan C <br />Plan D <br />Plan E <br />Future without condition <br />Plan selection ..... <br />Four tests of viability <br />Completeness <br />Effectiveness <br />Efficiency <br />Acceptability <br />Comparison of candidate plans <br />Selection of the recommended plan <br />Four account analysis ..... <br />Introduction . . . . . . <br />National economic development account <br />Benefits . . . . . . . . <br />Direct user benefits .... <br />External economies . . . . <br />Unemployed and underemployed resources. <br />Adverse effects . . . . . <br />Project costs . . . . . . . <br />Operation, maintenance, and <br />replacement costs (OM&R) <br />External costs <br />Summary . . . . . . . <br />Regional economic development account <br />Regional income effects .... <br />Beneficial effects on regional income <br />Adverse effects on regional income <br />Regional employment effects ..... <br />Beneficial effects <br />Adverse effects . . . . . <br /> <br />:O:OP~~ ~ <br /> <br />11i <br /> <br />Page <br /> <br />78 <br /> <br />78 <br /> <br />79 <br /> <br />79 <br />79 <br />79 <br />80 <br />81 <br />83 <br />86 <br />89 <br />92 <br />94 <br />97 <br />100 <br />101 <br />101 <br />101 <br />101 <br />102 <br />102 <br />103 <br />107 <br />108 <br />108 <br />109 <br />109 <br />109 <br />110 <br />110 <br />110 <br />110 <br /> <br />112 <br />112 <br />112 <br />112 <br />114 <br />114 <br />115 <br />117 <br />117 <br />117 <br />
The URL can be used to link to this page
Your browser does not support the video tag.