My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP10376
CWCB
>
Water Supply Protection
>
Backfile
>
10001-10999
>
WSP10376
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:58:37 PM
Creation date
10/12/2006 4:17:46 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8276.300
Description
Lower Gunnison Basin Unit - Colorado River Basin Salinity Control Project
State
CO
Basin
Colorado Mainstem
Water Division
4
Date
10/1/1981
Title
Lower Gunnison Basin Unit Feasibility Report and Proposed Draft E.I.S.
Water Supply Pro - Doc Type
EIS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />(~:t1~ <br /> <br />CHAPTER III <br /> <br />CHAPTER IV <br /> <br />!>"'.'" <br />l.<;~:~;::~ <br /> <br />CHAPTER V <br /> <br />CHAPTER VI <br /> <br />CONTENTS (Continued) <br /> <br />Page <br /> <br />Setting (continued) <br />Social and economic characteristics (continued) <br />Land use and ownership 48 <br />Public services 49 <br />Education . . . 49 <br />Health . . . . 50 <br />Other services 50 <br />Local government . 50 <br />Cultural resources 51 <br />Present water and related land resources <br />development 51 <br />Irrigation .... 51 <br />Private .... 51 <br />Uncompahgre Proj ect 52 <br />Dallas Creek Proj ect 53 <br />Municipal systems 53 <br />Montrose 53 <br />Delta . . . . 54 <br />Olathe 55 <br />Rural systems 55 <br />Project Seven 55 <br />Public involvement . . 57 <br />Uncompahgre Project improvement planning 57 <br />Lower Gunnison Basin Unit Planning 59 <br />Problems and needs . . . . . . . 62 <br />Colorado River Basin salinity . . 62 <br />Uncompahgre Valley . . . . . . . 65 <br />Uncompahgre Project facilities 65 <br />Water use and salinity . . . . 66 <br />Formulation of alternative plans . . 70 <br />Ability of resources to meet needs 70 <br />Scope of the study . . . . . . . . 71 <br />Criteria and standards for plans 71 <br />Potential salinity control methods and initial <br />screening 73 <br />Alternative plans . ..... . . . . . 74 <br />Lining . . . . . .......... 74 <br />Concrete line all Uncompahgre Project <br />canals and laterals . . . . . . . . 75 <br />Concrete line all canals and laterals in <br />adobe soil areas " . . . . . . . 75 <br />Concrete line all deteriorated sections of <br />canals and laterals . . . . . . . . . . 76 <br />Earth line all Uncompahgre Project canals <br />and laterals . . . . . . . . . . . 76 <br />Plastic line all Uncompahgre Project <br />canals and laterals . . . . . . . . 76 <br />Land retirement . . . . . . . . . . . . 77 <br />Retire an 8,OOO-acre block of land in the <br />northeast portion of the study area and <br />line deteriorated sections of canals and <br />laterals on both sides of the valley 78 <br /> <br />O:lfG40 <br /> <br />11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.