Laserfiche WebLink
<br /> <br />t: 4 <br />"1" <br />t.' . <br />:'~i{<' , <br />~.~~' <br />,;',:i 6 <br />",-:-" <br /> 1 <br /> 8 <br /> 9 <br /> 10 <br /> 11 <br /> 12 <br /> 13 <br /> 14 <br /> <br />o <br />C'l TABLE OF CONTENTS (contirmed) <br />N <br />QQ Illustrations <br />~ (bound at back of section) <br /> <br />Title <br /> <br /> <br />Boundaries of River Basins and POIver Market Areas <br />Existing and Potential HYdroelectric Projects <br />Mass curve of Stream FIOl'1s. Arkansas River at Little Rock. <br />A;rkansas <br />Mass eurve of Stream Flows. White River at Batesville. <br />Arkansas <br />Mass curve of Stream Floovs. Red River at Garland. A;rkansas <br />output and Peaking Capability of Existing and Approved <br />HYdro projects - Lower Arkansas River Basin <br />output and Peaking Capability of Existing and Under Con- <br />struction HYdroelectric, Projects - White River Basin <br />output and Peaking Capability of Existing and Under Con- <br />struction HYdroelectric Projects - Red River Basin <br />Regional Critical HYdro Period - Operation of 16 Existing. <br />Proviso. and Potential HYdroelectric Plants <br />Principal Generating Plants and Transmission Facilities <br />as of December 31. 1952 . <br />, Power Requirements of Electric Utilities~ 1945-19,2. with <br />Estimated Growth to 191, <br />Estimated Load Characteristics for 1960-1915 Period <br />Estimated Utilization of Hydroelectric Output - Regional <br />Critical Period - 1965 Load (by Load Areas) <br />Estimated Utilization of Hydroelectric Output - Regional <br />Critical Period - 1915 Load (by Load Areas) <br /> <br />v <br />