Laserfiche WebLink
<br /> <br />TABLE OF CONTENl'S (continued) <br /> <br />Tables <br />(bound at back of section) <br /> <br />Title <br /> <br />Sedimentation Data <br />Hydroelectric Plants Ex:isting and Under Constru.ction <br />Potential Hydroelectric Projects Sites not Included in the <br />N'lR Plan <br />Proviso Clause Projects <br />Potential Hydroelectric Plants in the AV/R Plan <br />Summary of pcr.ver Data far Total Hydroelectric Development <br />Installed and Dependable Capacity of Electric utility Gen-' <br />erating Plants as of December 31, 1952 <br />Electric Energy Sales to Farm CUstomers <br />Electric Energy Sales to Nonfarm Residential Customers <br />Electric Energy Sales to Commercial CUstomers <br />Summary of Electric Utility Ere:rgy Requirements <br />Summary of Power Requirements of Elect:ric Utilities <br />Scheduled Additions to Fuel-Elect:ric Generating Capacity <br />by 1960' <br />Hydroelectric Generating Capacity Unde:r Const:ruction or <br />Scheduled far Construction by 1960 <br />Estimated Retirement of Electric Utility Gene:rating Capac- <br />ity , , <br />Additional Dependable Capacity Required to Supply Esti- <br />mated Electric Utility Loads <br />Comparison - Power Requirements (1975) and Hydro Power <br />Available During Critical Period <br />Transmission System Costs, Proviso Clause and Potential <br />(fitffi Plan) Hydroelectric Projects <br />Alternative Fuel-Electric Power Supply Costs, Including <br />Transmission <br />Estimated Annual Power Benefits - Potential Hydroelectric <br />Projects, AWR Basins <br />Economic Feasibility of Projects Having Power Facilities <br />Included in the A\'/R Plan <br /> <br />I <br /> <br />, I <br />I <br /> <br />iv <br />