Laserfiche WebLink
<br /> <br />i <br />j COLORADO RIVER STORAGE PROJECT <br /> <br />I <br />PApNIA PARTICIPATING PROJECT--COLORADO <br /> <br />Prelimina,ry construction work on the Paoniap!oject started ~hortly <br />after the prIme' contract was . awarded to Bud Kmg OonstructlOn 00, <br />in January 195,9, At June 30,1959, the contractor had excavation <br />work )1Uderway for the spillway, stilling basin, and dam"access road, <br />Good l;'rogress iwas made driving the outlet works tunnel, and'in <br />relocatmg 0019rado State ~ighway 133, " . , <br />The cost of completed rroJect features and other account balances <br />applicable to tre origina Paonia project (authorized byth'e;Act of <br />June 25,: 1947)1 were taken into the Oolorado River storage project <br />a,CCO)1Uts durin~ the fiscal year. Extension of this project was author- <br />ized by the Oolorado Rivor Storage Project Act. ,', ., <br /> <br />4 <br /> <br />, , ' <br />CIPNTRA.L UTAH PAR,TICIPATING PROJECT; :VERNAL UNIT--UTA~ <br /> <br />.' ". . <br />'l'heprlpiecqntractfor construction of Stanal<er,Dam was awarded, <br />QnMay 4, 1959, to Morrison-Knudsen 00, Initial construction <br />activities were' confined to foundation excavation and placement of <br />the excavated i material in the embankment, Good Progress was <br />being made a~, J)1Ue30, 1959, in. relocating, highways, androa.ds, <br />electric power lines, and .telep!;one lines in the area of the project;: <br />, ' <br /> <br />1 <br />Duringfiscall Year 1959, studies were, continued On the plansfor:the <br />tran~mission'sys,temfor" the Oolorado River storage proje,ct,' Recon- <br />n;aissance surv,eys were made for, economic studies in,connectiohwitjl, <br />the routeselectlon for the,GlenOar>yon-Flaming Gorge interconnecting <br />transmission lire. Studies were continued to determine operating <br />voltages, type~nd size of conductor, location of)ines,and, operating <br />characteristICs lof the transmission system, ,Meetings"were planned <br />with prospective l;'reference customers,asso,ciations, int!;e ,seyer,,] <br />Stat,es andthdprlv"te utility groups in order that. these technical <br />problems cou]~ be discussedl\n<.! resolved cooperatively, ' <br /> <br />TRANSMISSION DIVISION <br /> <br />ADV.4NCE P-LANNING ACTIVITIE~ <br />:I>uring ,fiscal year 1959, an economic justification report was com- <br />pleted on thepptential Blue Mesa and Morrow Point Dl\msand power <br />plants of thequrecanti storage unit, ,Investigations of}he potential <br />OrystalDam rundpowerplant oIthe same umt were contmued,.and,a <br />supplemental report on that feature of theOureca.nti unitisscheduled <br />for fiscal year 1961. ' ' " "" <br />Definite plalI reports .were completed 01) the Seedskadee project, <br />Wyoming, ani\ the Smith Fork project, Oolorado. ,An, unfayorable <br />report on the'pine Rive:r project extension',Oolorado aud,N ew'Meidco, <br />was complete<j.' and ,transmitted to' OOI1gress;Adv;>i\M planning <br />studies for definite plan reports were continued during the 'fiscal <br />year on other authorized participating projects, " <br />I ' , <br />3." ALt:ocATION, OF' FEDERAL INVESTMENT <br />. ,- :. - , -':.:-," .,' " ",':.' <br />Section 6 of fublic Law 485 states thatupondQmpletion of each unit, <br />participating llfoject, or separable feature thereof, the Secretary shall <br />