My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP10141
CWCB
>
Water Supply Protection
>
Backfile
>
10001-10999
>
WSP10141
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:57:28 PM
Creation date
10/12/2006 4:09:37 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8542
Description
Conejos Division - Platoro
State
CO
Basin
Rio Grande
Water Division
3
Date
4/1/1947
Title
Supplemental Report - Conejos Division - San Luis Valley Project - Project report No. 5-101-1
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />........ <br />(1 <br />''<j1 <br />C'J <br />C..) <br />C; <br /> <br /> <br />f ',0" <br /> <br />"'-'" <br /> <br />UNITED STATES <br />DEPARTMENT OF THE IN'fERIOR <br />BUREAU OF RECLAMATION <br />REGION 5 <br />AMARILLO, ' TEXAS <br /> <br />April 30, 1947 <br /> <br />To: <br /> <br />COIIlJn1ssioner, Bureau of Reclamation <br /> <br />From: <br /> <br />Regional Director <br /> <br />Subject: Supplemental Report, Conejos Division, San Luis Valley project, <br />Colorado. <br /> <br />. ' <br /> <br />Transmittal <br /> <br />1. Herein is presented my report describing the plan of stage develop- <br />ment proposed for the Conejos Division of the San Luis Valley Project, <br />Colorado. The project, as described in House Document No. 693, Seventy-sixth <br />Congress, third session, was authorized for construction Apr:l.l 10, 1940, and <br />the Congress first appropriated funds for the project by the Interior <br />Appropriation Act of 1941. I reoommend that you present this supplemental <br />report for appropriate departmental action with the view of obtaining approv- <br />al for immediate construction of the Platoro Unit of the Conejos Division of <br />the project. <br /> <br />Authority for the Report <br /> <br />2. This report was prepared under the general authority of the Federal <br />Reclamation Laws (Act of June 17 1902, 32 Stat, 388, and acts amendatory <br />thereof or supplementary thereto~ an4 under the specific authority of the <br />Congress in the Interior Appropriation Act of 1941 (Act of June 18, 1940, <br />Ch. 395, 54 Stat. 406), the applicable portion of whioh I quote: <br /> <br />" <br />. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br />San ):ouis Valley Projeot, Colorado: For further investiga.- <br />tions, exploratory alld preparatory work, and commenoement <br />of construction in accordance with House Dooument numbered <br />693, Seventy-sixth Congnlss, third session: <br />" <br />. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> <br />The pertinent portior. of House DocUlnent NUr.1bered 693, on page 1, is quoted: <br /> <br />" <br />. . . . . , . . . . . . . . . . . . . . . . . . . . . . . . <br />Prior to oonstruction of the Conejos Unit, further investi- <br />ld!ona should be made to ascertain the desirability of sub- <br />sti tuting a single main-stream reservoir on its lower reaches <br />for the two res~rvoirs as better regulation will result, <br />Present data are inadequate for a f'inal decision, <br /> <br />. . . . . . . . . . . . . . . <br /> <br />II <br />. . . . . . . . . . . . . . . <br /> <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.