My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP10141
CWCB
>
Water Supply Protection
>
Backfile
>
10001-10999
>
WSP10141
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:57:28 PM
Creation date
10/12/2006 4:09:37 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8542
Description
Conejos Division - Platoro
State
CO
Basin
Rio Grande
Water Division
3
Date
4/1/1947
Title
Supplemental Report - Conejos Division - San Luis Valley Project - Project report No. 5-101-1
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />RESOLUTIOH <br /> <br />0') <br />,1 <br />~ <br />C\l <br />l.~~'-' <br />Co <br /> <br />WlffiREAS, the Board of Directors of Conejos Water <br />Conservancy District has oonsidered the plans of the <br />Bureau of Reclamation regarding the construction of t:,e <br />Conejos Division of the San Luis Valley Project hereto- <br />fore authorized by the Seoretary of the Interior and <br />described in House Document 693, 76th Congress, Third <br />Session, and the reco~endations of R. J. Tipton and <br />Associates, consulting engineers for the Board, in <br />regard thereto: liow therefore be it <br /> <br />RESOLVED, That the Eoard approves the recommonda- <br />tions of the Bureau and of its consulting encineers that <br />a single main stream reservoir on the Conejos river carulot <br />now be constructed at a cost which is economically justi- <br />fiable and that the development of_the water resources <br />of the Conejos river should proceQd by stages; and be <br />it further <br /> <br />RF:S,:LVi':D, That the Board favors the construotion <br />at the earliest possible date, as the first unit of the <br />Conejo. DividoD of the San Luis Valley Project, of the <br />Platoro Reservoir with a capacity of approximately 60,000 <br />acre feet and an estimated construction cost of approxi- <br />mately $~,750.000.00. sixty per oent (60%) of which con- <br />struction coat 18 to be allocated to lrrigaUon and forty <br />per cent (40%) to flood control in accordance with th~ <br />original findings embodied in House Dcc~~t 693, and be <br />it further <br /> <br />RESOLVED, That the Board firmly beHeves that on <br />the'basia atated above the coat allocated to irrigation <br />i. within the ability of the water user. to repay. <br /> <br />STATE OF COLORADO ) <br />} 3S <br />COUNTY OF CONEJ03 ) <br /> <br />We, Harry C. Meyers, President, and C. S. Birkins, <br />Secretary of Cone JOB Water Conservancy District do hereby <br />certify the above and foregoing to be a full, true and <br />correct copy of a Resolution adopted by the Board of. <br />Directors of Conejos Water Conservancy District at a <br />meeting held on the /.: day of March, A. D. 1947. <br /> <br /> <br />President <br />s rict <br /> <br />ATTEST! <br /> <br /> <br />, Secretary <br />District <br />
The URL can be used to link to this page
Your browser does not support the video tag.