My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP10103
CWCB
>
Water Supply Protection
>
Backfile
>
10001-10999
>
WSP10103
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:57:19 PM
Creation date
10/12/2006 4:08:27 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.111.I
Description
Central Utah Participating Project
State
UT
Basin
Colorado Mainstem
Date
6/17/1983
Author
USDOI-BOR
Title
Draft Environmental Statement Diamond Fork Power System
Water Supply Pro - Doc Type
EIS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Chapter III <br /> <br />CONTENTS (Continued) <br /> <br />Page <br /> <br />Alternatives (continued) <br />Other viable plans (continued) <br />Sixth Water Pumped Storage Alternative (cont.) <br />Project reservoir and powerplant <br />operation. . . . . . . . . . . 70 <br />Other planning considerations. . 71 <br />Actions required to implement the plan. 71 <br />Acquisition of land for project <br />features. . 71 <br />Public safety . . . 71 <br />Relocations . . . . 71 <br />Construction activities and schedule. 73 <br />1964 DPR Alternative. . . . . 73 <br />Plan accomplishments and concepts. 73 <br />Project facilities and measures. . 76 <br />Dams and reservoirs . . . ... . 76 <br />Powerplants and conveyance works. 76 <br />Switchyards and transmission lines. 78 <br />Roads . . . . . . . . . . . . . . 80 <br />Operating facilities and project <br />administration. . . . . . . 80 <br />Recreation facilities . . . . 80 <br />Fishery and wildlife measures and <br />mitigation. . . . . . . . . 80 <br />Other mitigation measures . . 82 <br />Project reservoir and powerplant <br />operation. . . . . . . . . . . 82 <br />Other planning considerations. . 82 <br />Actions required to implement the plan. 82 <br />Acquisition of land for project <br />features. . 83 <br />Public safety . . . 83 <br />Relocations . . . . 83 <br />Construction activities and schedule. 83 <br />No Power Alternative. . . . . 83 <br />Plan accomplishments and concept 83 <br />Project facilities and measures. 86 <br />Operation of project features. . 87 <br />Other planning considerations. . 87 <br />Actions required to implement the plan. 87 <br />Acquisition of land for project <br />features. . . . . . . . . 87 <br />Other . . . . . . . . . . . 87 <br />Alternative capacities considered for the Fifth <br />Water Pumped Storage Alternative . . . . . 89 <br />SOO-MW Fifth Water Pumped Storage Power- <br /> <br />plant . . . . . . . . . . . . . . 89 <br />2,OOO-MW Fifth Water Pumped Storage Power- <br />plant . . . . . . . . . . . . . . . . 89 <br />Alternative dam types and sizes considered for <br />the recommended plan . . . . . . . . 89 <br />Wildlife mitigation options considered . . 89 <br /> <br />iii <br />
The URL can be used to link to this page
Your browser does not support the video tag.