My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP10103
CWCB
>
Water Supply Protection
>
Backfile
>
10001-10999
>
WSP10103
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:57:19 PM
Creation date
10/12/2006 4:08:27 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.111.I
Description
Central Utah Participating Project
State
UT
Basin
Colorado Mainstem
Date
6/17/1983
Author
USDOI-BOR
Title
Draft Environmental Statement Diamond Fork Power System
Water Supply Pro - Doc Type
EIS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Chapter III <br /> <br />CONTENTS (Continued) <br /> <br />Alternatives (continued) <br />Recommended plan (continued) <br />Project facilities and measures (continued) <br />Other mitigation measures (continued) <br />Preservation of archeological, his- <br />torical, and paleontological <br />resources . . . . . . . . . . . . <br />Other considerations. . . . . . . . <br />Project reservoir and powerplant operation. <br />Other planning considerations . . . . . . . <br />Actions required to implement the plan . <br />Acquisition of land for project features <br />Public safety. . . . . . <br />Relocations. . . . . . . . . . . . . <br />Waste material disposal. . . . . . . <br />Construction activities and schedule <br />Other viable plans . . . . . . . . . . . <br />Sixth Water Flow Through Alternative. <br />Plan accomplishments and concept <br />Project facilities and measures. . <br />Dams and reservoirs . . . . . . <br />Powerp1ants and conveyance works. <br />Switchyards and transmission lines. <br />Roads . . . . . . . . . . . . . . <br />Operating facilities and project <br />administrat ion. . . . . . . <br />Recreation facilities . . . . <br />Fishery and wildlife measures and <br />mitigation. . . . . . . . . <br />Other mitigation measures . . <br />Project reservoir and powerplant <br />operation. . . . . . . . . . . <br />Other,planning considerations. . <br />Actions required to implement the plan. <br />Acquisition of land for project <br />features. . <br />Public safety . . . <br />Relocations . . . . <br />Construction activities and schedule. <br />Sixth Water Pumped Storage Alternative. <br />Plan accomplishments and concept <br />Project facilities and measures. . . <br />Dams and reservoirs . . . . . . . <br />Powerplants and conveyance works. <br />Switchyards and transmission lines. <br /> <br />Roads . . . . . . . . . . . . . . <br />Operating facilities and project <br />administration. . . . . . . <br />Recreation facilities . . . . <br />Fishery and wildlife measures and <br />mitigation. . . . . . . <br />Other mitigation measures . . <br /> <br />11 <br /> <br />Page <br /> <br />45 <br />45 <br />45 <br />46 <br />46 <br />48 <br />50 <br />50 <br />51 <br />51 <br />52 <br />52 <br />52 <br />53 <br />53 <br />56 <br />57 <br />59 <br /> <br />59 <br />59 <br /> <br />61 <br />61 <br /> <br />61 <br />61 <br />61 <br /> <br />62 <br />62 <br />62 <br />62 <br />62 <br />62 <br />67 <br />67 <br />67 <br />67 <br />70 <br /> <br />70 <br />70 <br /> <br />70 <br />70 <br />
The URL can be used to link to this page
Your browser does not support the video tag.