Laserfiche WebLink
<br />C"'J <br />~ <br />N <br />c:' Alternatives <br /> <br />\. ' <br /> <br />The planned alternative is the most practical means of reducing salt loading to the Colorado River <br />from the Orchard Mesa Mutual Lateral. Because no adverse environmental impacts will result <br />from installation of the project, no alternatives were evaluated in detail. <br /> <br />Consultation - Public Participation <br /> <br />Interagency consultation involved the Bureau of Reclamation, USFWS, and Colorado Division of <br />Wildlife. In addition, the State Historic Preservation Officer was consulted for information used in <br />the development of this assessment. <br /> <br />Consultation shows no unresolved conflicts with implementation of the plan. <br /> <br />Conclusion <br /> <br />The Environmental Assessment summarized above indicates this Federal action will not cause <br />significant local, regional, or national impacts on the environment. Therefore, based on the above <br />findings, I have determined an environmental impact statement for the Orchard Mesa Mutual <br />Lateral project is not required. <br /> <br />-, /1/ <br />/) . ~' (0r#~,>>-- <br />!1:u{c&I/..s2-- Ie <br />DUANE L. JOHNSON <br />State Conservationist <br /> <br />20 June 1994 <br /> <br />page 2 of2 <br />