<br />TRAN~~SSION DIVISION
<br />
<br />Location: The principal features are located in northern and central
<br />Arizona, western Coloradb, northwestern New Mexico, northeastern
<br />Utah, and southwestern Wyoming.
<br />Authorization: P.L. 84-485, approved by President April 11, 1956
<br />(70 Stat. 105).
<br />COnstruction:
<br />Started: July 1961
<br />In Progress as of June 30, 1968
<br />
<br />Interest Rate on COsts Allocated to Power: 2.875%
<br />
<br />Transmission Facilities
<br />Transmission Lines:
<br />3t56kV 230 kv
<br />7 .2 792.0
<br />Substations:
<br />Ten in service with a
<br />
<br />in Service as of June 30
<br />Circui t Hiles
<br />138 kv
<br />315.1
<br />
<br />1 68
<br />
<br />115 kv
<br />117.5
<br />
<br />Total
<br />1,700.8
<br />
<br />total capacity of 1,812,915 lCVA
<br />
<br />Primary Costs other Than Section 8
<br />
<br />costs Thru
<br />6/30/68
<br />
<br />Es timatell
<br />to complete
<br />
<br />Total
<br />
<br />Transmission Facilities including
<br />Transmission Lines, Substations,
<br />Switchyards, etc.
<br />Interest During Construction
<br />Corollary Construction Costs
<br />
<br />$117,814,808
<br />5,902,862
<br />725,263
<br />$124,442,933
<br />
<br />$34,422,547 $152,237,355
<br />965,138 6,868,000
<br />725,263
<br />$35,387,685 $159,830,618
<br />
<br />Tentative Allocation
<br />Reimbursable:
<br />Power
<br />
<br />(Excludes Oec. 8 Costs) Probable Repayment
<br />
<br />$159,830,618
<br />
<br />Storage Project Revenues
<br />CROF & COntributions
<br />
<br />$159,708,078
<br />122, 540
<br />$159,830,618
<br />
<br />The Transmission Division includes transmission lines, substations,
<br />switchyards (exclusive of switchyards at storage unit powerplants),
<br />and other associated facilities. It's purpose is to provide for the
<br />interconnection of storage project powerplants with each other, with
<br />participating project power facilities, with other Federal powerplants,
<br />and with the electrical facilities of the major investor-owned power
<br />companies in the Colorado River Basin area. The desired result is to
<br />deliver the greatest practicable amount of firm power and energy that
<br />can be produced to the load centers for sale. Completed features are
<br />to be operated by the Government.
<br />
<br />.
<br />
<br />Construction of the Poncha-Midway section of the eurecanti-Midway 230
<br />kv Transmission Line and the storage warehouse building at Archer Sub-
<br />station was completed during FY 1968. Contracts were also awarded for
<br />switches, load and frequency control equipment, automatic fault record-
<br />ing system, station service transformers, and construction of the Mid-
<br />way Substation. Construction continued on Stage 01 of the Rifle Sub-
<br />station.