My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP10016
CWCB
>
Water Supply Protection
>
Backfile
>
10001-10999
>
WSP10016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:56:56 PM
Creation date
10/12/2006 4:04:29 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.100.40
Description
CRSP
Basin
Colorado Mainstem
Date
6/30/1968
Author
USDOI
Title
Twelfth Annual Report on the Statuts of the Colorado River Storage Project
Water Supply Pro - Doc Type
Annual Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Rilli bi t C <br />Page 11 of 45 <br /> <br />Sheet 1 of 2 <br /> <br />NAVAJO STORAGE UNIT, COLORADO-NEW MEXICO <br /> <br />IDcation: Navajo nun is located in Northwestern New Mexico on the <br />San Juan River, 34 miles East of Fazmington and. 3~ miles down- <br />stre8lll from the confluence of the IDs Pinos and San Juan Rivers. <br />Authorization: P. L. 84-485 approved by President April 11, 1956 <br />(10 stat. 105). <br />Construction: <br />Started: October 1951 <br />Substantially Completed: August 1.962 <br />nun: Type - Zoned Earthfill, Height - 402', length - 3,648', <br />Total Capacity - 1,109,000 Acre-Feet <br /> <br />Interest Rate on Cost Allocated to M&I: 2.8151 <br />Operated by the Bureau of Reclamation <br /> <br />Primary Project Costs Other Than Section 8 <br />Navajo nun and Reservoir <br />General Property <br />Interest During Construction <br />Estimated Cost to complete Miscellaneous Construction <br />Total Costs Other Than Section 8 <br /> <br />Total Costs <br />$3CJ,OCJ5,619 <br />58,802 <br />1,211,241 <br />232,646 <br /> <br />$39,648,308 <br /> <br />Section 8 Costs <br />Waterfowl Area Development (Estimated) <br />Big Game Activities (Estimated) <br />Rough-Fish Eradication <br />Reservoir Fishery Investigation (Estimated) <br />Recreation (Estimated) <br />Total Section 8 Costs <br />Total Project Costs <br /> <br />$ 171,871 <br />333,692 <br />27,931 <br />131,700 <br />2,521,900 <br /> <br /> <br />Tentative Allocation <br />Reimbursable: <br />Irri~tion <br />M&I Water <br />Other <br />Subtotal <br />Nonreimbursable: <br />Fish and. Wildlife <br />Flood Control <br />Subtotal <br />Total <br /> <br />(Excludes Sec. 8 Costs) Probable Repayment <br /> <br />$23,171,687 <br />6,844,514 <br />44,04~ <br />$30,660,30 <br /> <br />$ 1,013,000 <br /> <br />t ~;L~:~ <br />39, ,~ <br /> <br />Storage Project Revenues <br />CRDF & Contributions <br /> <br />$30,551,620 <br />108,688 <br /> <br />$30,660,30CJ <br />
The URL can be used to link to this page
Your browser does not support the video tag.