|
<br />Exhibit C
<br />Page 8 of 45
<br />
<br />Sheet 1 of 3
<br />
<br />GLEN CANYON STORAGE UNIT, t1rAH-ARIZONA
<br />
<br />IDeation: The Glen Canyon Unit is located in northern Coconino
<br />County, Arizona and in Kane and San Juan Counties in south-
<br />eastern Utah.
<br />Authorization: P.L 84-485, approved by President A;pril 11, 1956,
<br />(70 Stat. 105).
<br />Construction:
<br />Started: September 1956
<br />Substantially Completed: November 1967
<br />Dam: Type - Concrete Arch, Height - 710', Length - 1,560',
<br />Total Capacity - 27,000,000 Acre-Feet
<br />
<br />Interest Rate on Costs Allocated to Power and Municip~l and Industrial
<br />Water: 2.875'1>
<br />
<br />Power Production
<br />Initial Power Production:
<br />Last Unit Installed:
<br />Kilowatt Capacity:
<br />Number of Units:
<br />Size of Units:
<br />Net Generation to IBte:
<br />Operated by the Bureau of
<br />
<br />September 1964
<br />February 1966
<br />900,000 kw
<br />8
<br />112 , 500
<br />9,554,296,200
<br />Reclamation
<br />
<br />Primary Project Costs Other Than Section 8
<br />Glen Canyon Dam and Reservoir
<br />Glen Canyon Powerplant and Switchyard
<br />General Property
<br />Interest During Construction
<br />Estimate to Complete Misc. Construction
<br />Total Costs Other Than Section 8
<br />
<br />Total Cost
<br />$158,846,726
<br />77,586,965
<br />8,337,120
<br />22,848,716
<br />3,819,934
<br />
<br />$271,439,461
<br />
<br />Section 8 Costs
<br />Fish and Wildlife (Estimated)
<br />Recreation (Estimated)
<br />Total Section 8 Costs
<br />Total Project Cost
<br />
<br />$ 387,580
<br />26,623,000
<br />27 010 580
<br />$298;450;041
<br />
<br />Tentative Allocation
<br />Reimbursable:
<br />Irrigation
<br />Power
<br />14&I Water
<br />Other
<br />Subtotal
<br />Nonreimbursable:
<br />Fish and Wildlife
<br />Total
<br />
<br />(Excludes Sec. 8 Costs) Probable Repayment
<br />
<br />$ 50,445,844
<br />205,427,001
<br />6,305,894
<br />2,465,584
<br />$264,644,323
<br />
<br />6,795,138
<br />ito271,439,461
<br />
<br />Storage Project Revenues
<br />CRDF & Contributions
<br />
<br />$261,490,619
<br />3,153,704
<br />$264,644,323
<br />
<br />~
<br />
|