|
<br />CURECANTI STORAGE UNIT, COLORADO
<br />
<br />EY.hibit C
<br />P9.ge 3 of 45
<br />
<br />Sheet 1 of 2
<br />
<br />Location: The Curecanti Unit is located in west-central Colorado
<br />on the Gunnison River.
<br />Authorization: P.L. 84-485, approved by President April 11, 1956,
<br />(70 Stat. 105).
<br />Construction:
<br />Started: June 1961
<br />In Progress as of: June 30, 1968
<br />Blue Mesa L'am: Type - Zoned Earthf'i11, Height - 390', length - 785',
<br />Total Capacity - 941,000 Acre-Feet
<br />l-brrow Point L'am: Type - Concrete Thin Arch, Height - 468' ,
<br />length - 720', Total Capacity - 117,000 Acre-Feet
<br />Crystal L'am: Type - Zoned Earthi'i11, Height - 230', length - 660',
<br />Total Capacity - 27,240 Acre-Feet
<br />
<br />Interest Rate on Costs Allocated to Paver: 2.6321>
<br />
<br />September 1967 (Blue Mesa)
<br />208,000 kw (Blue Mesa - 60,000 kw, l-brrow
<br />Point - 120,000 k;{, & Crystal - 28,000 kw)
<br />5 (Blue Mesa - 2, Morrow Point - 2,
<br />& Crystal - 1)
<br />(Blue Mesa - 30,000 kw, Morrow Point -
<br />60,000 k;{, & Crystal - 28,000 k;{)
<br />145,013,400 kwh (Blue Mesa)
<br />
<br />Power Production
<br />Initial Power Production:
<br />Kilowatt Capacity:
<br />
<br />Number of Units:
<br />
<br />8i ze of Units:
<br />
<br />Net Generation to Late:
<br />
<br />Section 8
<br />Costs Thru
<br />6 30 68
<br />30,79,772
<br />9,847,476
<br />18,467,610
<br />11,341,678
<br />2,396,171
<br />482,805
<br />72,170
<br />5,802,481
<br />~79,180,163
<br />
<br />Primary Project Costs other Than
<br />
<br />Blue Mesa Dam & Reservoir
<br />Blue Mesa Powerplant & Sw1 tchyard
<br />Morrow Point L'am & Reservoir
<br />Morrow Point Powerplant & SI<i tchyard
<br />Crystal L'am & Reservoir
<br />Crystal Powerplant & Sw1 tchyard
<br />General Property
<br />Interest During Construction
<br />Total Costs other Than Section 8
<br />
<br />Section 8 Costs
<br />Fish and. \,ildl1fe
<br />Recreation
<br />Total Section 8 Costs
<br />Total Estimated Project Costs
<br />
<br />
<br />Estimated
<br />to c::b1ete
<br />$ 2 0,225
<br />(132,391)
<br />(429,610 )
<br />4,730,322
<br />17,027,829
<br />6,429,195
<br />1,595,830
<br />2,~52,519
<br />~32, 13,922
<br />
<br />$ 2,201,659
<br />4:727:374
<br />$ 6 ~9 033
<br />$39,3 2,955
<br />
<br />Total
<br />$31,010,000
<br />9,715,085
<br />18,038,000
<br />16,072,000
<br />19,424,000
<br />6,912,000
<br />1,668,000
<br />8,75~,ooo
<br />$111,59 ,085
<br />
<br />$ 3,284,849
<br />5,7G6,800
<br />$ 9,0 l,64t
<br />$120,635,73
<br />
|