Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Figure 13- <br /> <br />Figure 14- <br /> <br />Figure 15- <br /> <br />Table I - <br />Table 2 - <br />Table 3 - <br />Table 4 - <br />Table 5 - <br />Table 6 - <br /> <br />TABLE OF CONTENTS (CONT'D.) <br /> <br />Total Phosphorus Loads to Cherry Creek Reservoir from Cherry Creek Main <br />Stem, August 1994 - July 1995 <br />Total Nitrate-Nitrogen Loads to Cherry Creek Reservoir from Cherry Creek Main <br />Stem, August 1994 - July 1995 <br />Comparison of Point vs. Non-Point Phosphorus Loading to the Reservoir from <br />Cherry Creek Mainstem <br /> <br />Water Quality Monitoring Stations for Phase I Baseline Study <br />Water Quality Monitoring Parameter List <br />Monthly Sampling Summary <br />Surface Flow Data at Cherry Creek Monitoring Stations <br />Rinse Blank and Field Blank Sample Analyses <br />Point versus Non-Point Sources of Phosphorus from Cherry Creek Mainstem <br /> <br />Appendix A- Surface Water Analytical Data Summary <br />Appendix B- Ground Water Analytical Data Summary <br />Appendix C- Cherry Creek Channel Sediment Sample Analyses Summary <br />Appendix D- Field Water Quality Parameter Data <br />Appendix E - Surface Water and Ground Water Daily Loading Rates Summary <br />Appendix F- Glossary <br /> <br />u <br />