My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP09985
CWCB
>
Water Supply Protection
>
Backfile
>
9001-10000
>
WSP09985
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:56:49 PM
Creation date
10/12/2006 4:02:49 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8210.470
Description
Pacific Southwest Interagency Committee
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
3/2/1971
Author
PSIAC
Title
Quarterly Reports - 71-1 through 71-4
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />~02222 <br />/ <br /> <br />. <br /> <br />. <br /> <br />'. <br /> <br />PACIFIC SOUTHWEST INTER-AGENCY COMMITTEE <br />Quarterly Report for Colorado <br />71-2 Meeting <br /> <br />Construction <br /> <br />Bids for Crystal Dam, the third and final dam <br />for the Curecanti Unit near Gunnison, were opened May 25, <br />1971. Apparent low bidder was Hensel Phelps Construction <br />Company of Greeley, Colorado, with a bid of $25..983,380. <br />A Bureau of Reclamation spokesman said the contract probably <br />will be awarded in July, and the contractor has 1500 days <br />to complete the project. That would make completion date in <br />the fall of 1975. <br /> <br />Six other bids were submitted, all of which were <br />higher than the engineer's estimate of $20,999,997. The <br />next lowest bidders were the Guy F. Atkinson Co. of San <br />Francisco at $31.7 million and Gordon H. Ball Inc. of <br />Danville, California, at $33.6 million. The high bid was <br />$38.8 million. <br /> <br />Silver Jack Dam of the Bostwick Park Project near <br />Montrose, Colorado, has been completed except for second- <br />stage work in the outlet works and cleanup work in the <br />general area. Storage of water in the reservoir has been <br />started and will continue during the spring runoff. Bids <br />were opened on May 13 for installation of a trash barrier <br />and ~otective fencing in the spillway area. <br /> <br />Advance Planninq <br /> <br />Designs and cost estimates have been completed <br />for the definite plan report of the Savery-Pot Hook Project <br />near Craig, Colorado. The financial analysis and a draft <br />of the report are now being completed and will be forwarded <br />to the Regional Office of the Bureau of Reclamation for <br />review and processing in the near future. <br /> <br />Useof advance planning funds for the Dallas Creek <br />Project near Montrose, Colorado, was interrupted for about <br />three months by the temporary placement of the funds in <br />budgetary reserve, The funds were restored about three <br />
The URL can be used to link to this page
Your browser does not support the video tag.