Laserfiche WebLink
<br /> <br />San Juan-Cham~ <br />Water Accounting <br />Albuquerque Area Office <br />December 1999 <br /> <br />" <br />~t~ <br />-;,." <br /> <br />The natural inflow into Heron Reservoir during the month of December was computed <br />to be 156 acre-feet (AF) as shown in Table 3. There were 365 AF net San Juan- <br />Chama (SJ-C) losses, as shown in Table 2. There were no diversions through <br />Azotea Tunnel this month. <br /> <br />There was a total of 354 AF of Natural (RG) released from Heron. There was 4400 <br />AF of SJ-C released in December, of which 1430 AF was the City of Santa Fe's <br />delivery to Abiquiu, and 2970 AF of the City of Albuquerque's delivery to <br />Abiquiu. <br /> <br />There was 198 AF of SJ-C water released from El Vado of which the total was <br />released from Middle Rio Grande Conservancy District to the City of Santa Fe in <br />Abiquiu as payback for irrigation use. <br /> <br />There was 4056 AF of SJ-C water released from Abiquiu, of which 1265 AF was for <br />Santa Fe to offset effects below Otowi(letter dated 10/05/99), 20 AF for Los <br />Lunas's effects below Otowi (letter dated 11/29/99), 355 AF for Bernalillo's use <br />below Otowi (letter dated 10/5/99), 151 released for Nambe Falls Dam effects at <br />Otowi, 2265 AF was released to Coc~iti's rec pool. <br /> <br />There was 0.01 inches of precipitation at <br />December (running) average of 1.26 inches. <br />Reservoir are summarized in Tables 1-3. <br /> <br />Heron Reservoir, which is 1% of the <br />The monthly computations for Heron <br /> <br />Total inflow into Nambe Falls Reservoir was computed to be 276 AF. There were 1 <br />AF of losses on the reservoir. Table 4 summarizes San Juan-Chama water at Otowi. <br /> <br />Estimated sediment deposition in the San Juan-Chama pools at Abiquiu and Jemez <br />Canyon Reservoirs, and Cochiti Lake are presented in Tables 5A-5C. Storage and <br />evaporation of Rio Grande water in El Vado and Ab.iquiu Reservoirs are shown in <br />Table 6. <br /> <br />All data are provisional and subject to revision as final data are collected and <br />analyzed. <br />