My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP09943
CWCB
>
Water Supply Protection
>
Backfile
>
9001-10000
>
WSP09943
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:56:37 PM
Creation date
10/12/2006 4:02:16 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8442.900
Description
Missouri Basin - Pick Sloan Project - Project Funding
State
CO
Basin
South Platte
Water Division
1
Date
7/1/1978
Title
Review of Repayment Status of Pick-Sloan Missouri Basin Program and Individually Authorized Projects Bureau of Reclamation
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Total <br />Inves tmen t <br /> <br />(Millions) <br />Unpaid <br />June 30, <br /> <br />at <br />2078 <br /> <br /> <br />. BACKGROUND AND SUMMARY <br /> <br />\ <br /> <br />Generally, the Corps constructs multipurpose and flood control facili- <br /> <br />ties on the Missouri River and flood control facilities on tributary <br /> <br />streams. The Bureau constructs irrigation facilities on the Missouri <br /> <br />River and multipurpose and irrigation facilities on tributary streams. <br /> <br />Each agency operates the facilities it constructs, including hydro- <br /> <br />electric generation facilities. Prior to October 1, 1977, at which <br /> <br />time the responsibilities were transferred to DOE, the Bureau also <br /> <br />constructed power transmission lines and marketed the power not needed <br /> <br />for operating the Bureau and Corps facilities. <br /> <br />Most of the System's ultimately~planned power generation facilities <br /> <br />are now in operation; the majority of irrigation facilities are yet to <br /> <br />be built. <br /> <br />At September 30, 1976, the Federal investment in the System was over <br /> <br />$2.4 billion~ Over $1.9 billion had been allocated to functions that <br /> <br />are expected to repay those costs through power, irrigation, and munic- <br /> <br />ipal and industrial (M&I) water revenues, and the remainder was allo- <br /> <br />cated to nonreimbursable functions (see exhibit I). The 1976 PRS <br /> <br />shows the investment in reimbursable functions repayable from power <br /> <br /> <br />revenues at $5.8 billion by 2078 (the last year in the PRS) as follows: <br /> <br />Power and replacements <br />Aid to irrigation <br /> <br />$2,694 <br />3,140 <br /> <br />$ 40 <br />1,258 <br /> <br />$5,834 <br /> <br />$1,298 <br /> <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.