My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP09943
CWCB
>
Water Supply Protection
>
Backfile
>
9001-10000
>
WSP09943
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:56:37 PM
Creation date
10/12/2006 4:02:16 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8442.900
Description
Missouri Basin - Pick Sloan Project - Project Funding
State
CO
Basin
South Platte
Water Division
1
Date
7/1/1978
Title
Review of Repayment Status of Pick-Sloan Missouri Basin Program and Individually Authorized Projects Bureau of Reclamation
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />21 <br /> <br /> <br />Coordination necessary to <br />address recommendations <br /> <br />Addressing these recommendations will require coordination among the <br /> <br />Corps of Engineers (which has responsibility for allocation of and <br /> <br />accounting. for costs of its projects in Pick-Sloan), Dor and DOE in <br /> <br />terms of their responsibilities, including those necessary to imple- <br /> <br />ment the requirements of the President's Water Policy Message of <br /> <br />June 6, 1978, as they affect Pick-Sloan. <br />
The URL can be used to link to this page
Your browser does not support the video tag.